Jump to content

polavaram


Recommended Posts

  • Replies 3.3k
  • Created
  • Last Reply

Swas bro, could you please post the numbers. Also, at what height gates will be installed on this cofferdam ? It is important because that decides how much of 60 TMC is usable after the flood season. Through gravity, I think only around 10-15 TMC is usable. after that,  pattiseema and Barrage can use some of the remaining water. 

Link to comment
Share on other sites

Coppor Dam - 41 Feet, 60 TMC water ki permission ichharu. 35 Meters nunchi water canals ki velthaayi.

 

Polavaram main dam - 53/54 Feet varaku vuntundi, 180/185 TMC water.

 

 

I think we must fit some gates in middle of coffer dam also because Godavari delta ki kuda water supply cheyali ga.  I mean some gates in down part so that even low water levels una sare we can just lift the gates and save godavari delta completely is possible using this. Godavari delta 14lakhs acres must be given 1st preference.

 

If water levels are less then 35 meters we can't supply water to both left and right canals. Godavari delta needs 250tmc share undi per year so we need to take care of it 1st by keeping some gates in lower part so that we can send water to godavari delta.

 

dowleswaram barrage storage capacity is just 3tmc we need to maintain for 100 days we can send 300tmc to canals and save godavari delta

Link to comment
Share on other sites

14322426_832975416838053_679487303971199

 

From now Monday is polavaram day

 

Better polavaram ni CM Dash board lo petti hourly works monitor cheyali 24*7 works ayithe baguntundi by giving power connection there govt can do 3 times more work

pressure ekuva aipotadi emo..
Link to comment
Share on other sites

pola.jpg

 

eenadu news lo chusa till main dam will take some time before that we can use coffer dam which will be removed after main dam construction which is temporary but using both canals 25-30 lakhs acres ni save cheyochu and drinking water and godavari delta 15lakhs acres ki water problems solve cheyochu ani agricultural dept main head interview in eenadu, total of 40-45 lakhs acres will be stabilized and drinking  water for lakhs of people. If we use coffer dam for 2-3 years 10,000-15000 crores food grains will increase in state ani stats cheparu. :terrific:  :terrific:  :terrific:

 

Some saying it is waste of money but totally state will get 30,000-40,000 more agricultural products which is a big figure in 2-3 years GDP also gets increases but we spend only 20% of total profits which is very feasible

Link to comment
Share on other sites

 

 

see this video but not full video

 

 

eenadu news lo chusa till main dam will take some time before that we can use coffer dam which will be removed after main dam construction which is temporary but using both canals 25-30 lakhs acres ni save cheyochu and drinking water and godavari delta 15lakhs acres ki water problems solve cheyochu ani agricultural dept main head interview in eenadu, total of 40-45 lakhs acres will be stabilized and drinking  water for lakhs of people. If we use coffer dam for 2-3 years 10,000-15000 crores food grains will increase in state ani stats cheparu.  :terrific:   :terrific:   :terrific:

 

Some saying it is waste of money but totally state will get 30,000-40,000 more agricultural products which is a big figure in 2-3 years GDP also gets increases but we spend only 20% of total profits which is very feasible

 
Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...