OnlyTDP Posted September 15, 2016 Share Posted September 15, 2016 CBN is going in the right direction.. cheppina time ki phase 1 complete ayithe UA, Krishna Delta ki panduga, indirect gaa Seema ki Link to comment Share on other sites More sharing options...
swas Posted September 15, 2016 Share Posted September 15, 2016 CBN is going in the right direction.. cheppina time ki phase 1 complete ayithe UA, Krishna Delta ki panduga, indirect gaa Seema ki see video 60tmc ki entha money and all works entha balance all things are there in video Link to comment Share on other sites More sharing options...
swarnandhra Posted September 15, 2016 Share Posted September 15, 2016 Swas bro, could you please post the numbers. Also, at what height gates will be installed on this cofferdam ? It is important because that decides how much of 60 TMC is usable after the flood season. Through gravity, I think only around 10-15 TMC is usable. after that, pattiseema and Barrage can use some of the remaining water. Link to comment Share on other sites More sharing options...
Suresh_Ongole Posted September 16, 2016 Share Posted September 16, 2016 Central govt accepted 41 tmc storage only for cofferdam. Link to comment Share on other sites More sharing options...
sonykongara Posted September 16, 2016 Author Share Posted September 16, 2016 @Suresh_Ongole, 41 feet varaku anukunta bro Link to comment Share on other sites More sharing options...
RKumar Posted September 16, 2016 Share Posted September 16, 2016 Coppor Dam - 41 Feet, 60 TMC water ki permission ichharu. 35 Meters nunchi water canals ki velthaayi. Polavaram main dam - 53/54 Feet varaku vuntundi, 180/185 TMC water. Link to comment Share on other sites More sharing options...
swas Posted September 16, 2016 Share Posted September 16, 2016 Coppor Dam - 41 Feet, 60 TMC water ki permission ichharu. 35 Meters nunchi water canals ki velthaayi. Polavaram main dam - 53/54 Feet varaku vuntundi, 180/185 TMC water. I think we must fit some gates in middle of coffer dam also because Godavari delta ki kuda water supply cheyali ga. I mean some gates in down part so that even low water levels una sare we can just lift the gates and save godavari delta completely is possible using this. Godavari delta 14lakhs acres must be given 1st preference. If water levels are less then 35 meters we can't supply water to both left and right canals. Godavari delta needs 250tmc share undi per year so we need to take care of it 1st by keeping some gates in lower part so that we can send water to godavari delta. dowleswaram barrage storage capacity is just 3tmc we need to maintain for 100 days we can send 300tmc to canals and save godavari delta Link to comment Share on other sites More sharing options...
Suresh_Ongole Posted September 16, 2016 Share Posted September 16, 2016 @Suresh_Ongole, 41 feet varaku anukunta bro Sorry Sony. It's my mistake. Link to comment Share on other sites More sharing options...
sonykongara Posted September 16, 2016 Author Share Posted September 16, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 16, 2016 Author Share Posted September 16, 2016 Link to comment Share on other sites More sharing options...
swas Posted September 16, 2016 Share Posted September 16, 2016 From now Monday is polavaram day Better polavaram ni CM Dash board lo petti hourly works monitor cheyali 24*7 works ayithe baguntundi by giving power connection there govt can do 3 times more work Link to comment Share on other sites More sharing options...
Anne Posted September 16, 2016 Share Posted September 16, 2016 From now Monday is polavaram day Better polavaram ni CM Dash board lo petti hourly works monitor cheyali 24*7 works ayithe baguntundi by giving power connection there govt can do 3 times more work pressure ekuva aipotadi emo.. Link to comment Share on other sites More sharing options...
sonykongara Posted September 16, 2016 Author Share Posted September 16, 2016 Link to comment Share on other sites More sharing options...
swas Posted September 16, 2016 Share Posted September 16, 2016 pressure ekuva aipotadi emo.. State meda padindi ga construction even money ekkuva ayina works on time ayithe chalu main target water nilabadithe chalu 2019 elections time ki it is enough to win 6 dsts one sided votes padutayi Link to comment Share on other sites More sharing options...
sonykongara Posted September 17, 2016 Author Share Posted September 17, 2016 Link to comment Share on other sites More sharing options...
Ntrforever Posted September 17, 2016 Share Posted September 17, 2016 Power project centre ka state ka Yemi decide chesaru ? Link to comment Share on other sites More sharing options...
sonykongara Posted September 17, 2016 Author Share Posted September 17, 2016 Power project centre ka state ka Yemi decide chesaru ? state ne kaduthundi Link to comment Share on other sites More sharing options...
swas Posted September 17, 2016 Share Posted September 17, 2016 eenadu news lo chusa till main dam will take some time before that we can use coffer dam which will be removed after main dam construction which is temporary but using both canals 25-30 lakhs acres ni save cheyochu and drinking water and godavari delta 15lakhs acres ki water problems solve cheyochu ani agricultural dept main head interview in eenadu, total of 40-45 lakhs acres will be stabilized and drinking water for lakhs of people. If we use coffer dam for 2-3 years 10,000-15000 crores food grains will increase in state ani stats cheparu. Some saying it is waste of money but totally state will get 30,000-40,000 more agricultural products which is a big figure in 2-3 years GDP also gets increases but we spend only 20% of total profits which is very feasible Link to comment Share on other sites More sharing options...
Ntrforever Posted September 17, 2016 Share Posted September 17, 2016 state ne kaduthundiofficial ga confirm chesara with out any litigations ? Link to comment Share on other sites More sharing options...
swas Posted September 17, 2016 Share Posted September 17, 2016 see this video but not full video eenadu news lo chusa till main dam will take some time before that we can use coffer dam which will be removed after main dam construction which is temporary but using both canals 25-30 lakhs acres ni save cheyochu and drinking water and godavari delta 15lakhs acres ki water problems solve cheyochu ani agricultural dept main head interview in eenadu, total of 40-45 lakhs acres will be stabilized and drinking water for lakhs of people. If we use coffer dam for 2-3 years 10,000-15000 crores food grains will increase in state ani stats cheparu. Some saying it is waste of money but totally state will get 30,000-40,000 more agricultural products which is a big figure in 2-3 years GDP also gets increases but we spend only 20% of total profits which is very feasible Link to comment Share on other sites More sharing options...
sonykongara Posted September 18, 2016 Author Share Posted September 18, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 18, 2016 Author Share Posted September 18, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 19, 2016 Author Share Posted September 19, 2016 A Link to comment Share on other sites More sharing options...
swas Posted September 19, 2016 Share Posted September 19, 2016 Better inka machinery pettali appude use because 5 months minimum godavari flow valla works are stopping so from november flows will decrease and we need to make works more faster ever. Link to comment Share on other sites More sharing options...
sonykongara Posted September 20, 2016 Author Share Posted September 20, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 20, 2016 Author Share Posted September 20, 2016 Link to comment Share on other sites More sharing options...
swas Posted September 20, 2016 Share Posted September 20, 2016 eee 50,000 cusecs enti i didn't understand?? Polavaram right canal 1.5tmc/day kada Link to comment Share on other sites More sharing options...
Sudhakar999 Posted September 20, 2016 Share Posted September 20, 2016 eee 50,000 cusecs enti i didn't understand?? Polavaram right canal 1.5tmc/day kada pattiseema pump chesedi per day gurinchi cheppadanukonta Link to comment Share on other sites More sharing options...
swas Posted September 20, 2016 Share Posted September 20, 2016 pattiseema pump chesedi per day gurinchi cheppadanukonta adi 8500 cusecs ante 0.75tmc eee ga 55000?? 55000 cusecs ante 4.5tmc/day kada even left+right canals kalipina 2.5tmc/day is only possible Link to comment Share on other sites More sharing options...
Paruchuri Posted September 20, 2016 Share Posted September 20, 2016 Kaliyuga Bhagiradhudu Cbn Link to comment Share on other sites More sharing options...