Last 3 years trend chuste Praksam-pulichintala madhya too much rain padutundi and we are leaving to sea.
CBN cheppinatlu, Vykuntapuram and Yanamalakudu projects ni serious ga tesukovali.

 

Eddu vagu,Munneru,Narukullapadu,Kondaveti ivanni waste ga sea loki vadilestunam.

Link to comment
Share on other sites

Guest Urban Legend

Last 3 years trend chuste Praksam-pulichintala madhya too much rain padutundi and we are leaving to sea.

CBN cheppinatlu, Vykuntapuram and Yanamalakudu projects ni serious ga tesukovali.

 

Eddu vagu,Munneru,Narukullapadu,Kondaveti ivanni waste ga sea loki vadilestunam.

 

dabbu vuntey em aina kattukovachu annai

AP poor state and financial ga laakostunnadu CBN kabbati ...konni lekkalu chusthey bayam vestundhi e center mundalu rupayi ichedhi ledhu

Link to comment
Share on other sites

@Urban Legend,

 

Ya. just 6-9k irrigation budget tho wonders chesadu CBN 2 years lo responsible ga plan chesi.

just 5 years lo 2009 ke 75,000 budidalo posi kanisam pulchintala kuda work start cheyyala.

 

Yesterday sakshi Joke, 90% Pulichintala panulu YSR gadi time lo ayyayi anta.

Chetta xxxx gallu asalu siggu anedi ledu. 2004 lo foundation vesi contractor gadu work stop chesadu ventane

2010 daka malli emi cheyyala.

 

YSR gadu kavalani pulichitalani xxxxx nakinchadu anni rakalu ga. CHivaraki kattina kani full fldge upoyagam leni situation ippudu

 

 

"the contractor changed the designs reducing the number of gates from 33 to 24 and also changed the left non-over flow (NOF) dam from concrete to earth leading to another controversy. Though the TDP strongly opposed the changes in design, YSR government stood by the contractor saying that he was permitted to do it under EPC.

 

Now Center inspection committee is objecting that EARTH work quality instead of CONCRETE and saying it is risky to store 45 TMC water.

Link to comment
Share on other sites

store chestthe tg lo konni villages munigipothayi vallu kali chestharo ledo.

 

Yes, floods vaste downstream diviseema, konaseema munigipovachhu kaani, paina vallu munigipokoodadu

 

enni rojulu ee anyayam

 

kandistunnam, teevramga kandistunnam

Link to comment
Share on other sites

AP govt 30 TMC store cheyyali ankutunadi anta. tg govt ki cheppesaru.

 

E pulichintala chala dangerous design approve chesaru compared to original . Original Concrete ettesi earth work tho support frame kattaru. Experts made lot of noise but YSR govt given special permission for that change to benefit contractor.

 

Irrigation experts are worried of this project strength and also center inspection committee raised lot of concerns.

They suggested lot of repair works recently. avi cheyyamani adigite contractor gadu extra money adigadu.

 

Recently AP govt asked for strengthening of project and the contractor wanted extra 350 crores.  As per YSR govt special provisions given we have no option but to pay and getting things corrected to be safe.

 

Safety 1st a repairs ayye daka anna koncham santinchandi.

 

bemmi.torture.gif

 

 

A design change  taruvata kuda project start cheyyala contractor gadu even though it saved 60 crores for him outright.

Malli 2010 lo start chesi penalty kuda dobbadu "jalayagnam clauses tho".

 

Ippudu latest ga malli ade Jalayagnam clause chupinchi "repairs ki he is asking more money"

Link to comment
Share on other sites

E pulichintala chala dangerous design approve chesaru compared to original . Original Concrete ettesi earth work tho support frame kattaru. Experts made lot of noise but YSR govt given special permission for that change to benefit contractor.

 

Irrigation experts are worried of this project strength and also center inspection committee raised lot of concerns.

They suggested lot of repair works recently. avi cheyyamani adigite contractor gadu extra money adigadu.

 

Recently AP govt asked for strengthening of project and the contractor wanted extra 350 crores.  As per YSR govt special provisions given we have no option but to pay and getting things corrected to be safe.

 

Safety 1st a repairs ayye daka anna koncham santinchandi.

 

bemmi.torture.gif

 

 

A design change  taruvata kuda project start cheyyala contractor gadu even though it saved 60 crores for him outright.

Malli 2010 lo start chesi penalty kuda dobbadu "jalayagnam clauses tho".

 

Ippudu latest ga malli ade Jalayagnam clause chupinchi "repairs ki he is asking more money"

okati  rendu sarlu varada ki kottuku poyindi, miku guruthu undha bro.

Link to comment
Share on other sites

okati  rendu sarlu varada ki kottuku poyindi, miku guruthu undha bro.

 

Naku dani gurinchi chana telusu. 

 

a project meda chana durmargalu chesadu divangath. vadiki a project avvatam istam ledu so kavalani anni edava panulu cesadu.

Peruki 2004 October lo 1st foundation vesadu kani behind scenes anni edava panule.

 

major support non over flow frame ki " concrete ettesi EARTH work" mana nethi meda pettadu sannasi. appatlo center irrigation kuda concern raise chesindi and even retried Vijayawada irrigation xperts like Veeraiah garu. Valla meda YSR gadi batch eagabaddaru meku emi telusu ani.

 

Final ga 4 months back central committe suggested extra reapirs as a workaround safety for 30 TMC.

Not sure if those are done.

Link to comment
Share on other sites

Naku dani gurinchi chana telusu. 

 

a project meda chana durmargalu chesadu divangath. vadiki a project avvatam istam ledu so kavalani anni edava panulu cesadu.

Peruki 2004 October lo 1st foundation vesadu kani behind scenes anni edava panule.

 

major support non over flow frame ki " concrete ettesi EARTH work" mana nethi meda pettadu sannasi. appatlo center irrigation kuda concern raise chesindi and even retried Vijayawada irrigation xperts like Veeraiah garu. Valla meda YSR gadi batch eagabaddaru meku emi telusu ani.

 

Final ga 4 months back central committe suggested extra reapirs as a workaround safety for 30 TMC.

Not sure if those are done.

chesaru le mana vallu

Link to comment
Share on other sites

@AnnaGaru Who is the contractor for Pulichinthala ? Project pina rework chesi capacity pencha vachha ?

Srinivasa constructions.. Capapcity penchetam kadu gani mundu "support non over-flow earth tesese concrete cheyyali safety ki"

Gates ki pakkana flood vaste side lo katte frame adi. danni earth work tho support ki change chesaru after he got contract.

 

Recent inspection found below

 

- weakness in support and structure

- gates not opening properly e.t.c

 

One of the main reasons YSR never started RESERVOIR/DAM in Jalayagnam is because it has Central inspection so looting is not easy.

In 75,000 crores Jalayagnam works by 2009 they never took any storage works as it will have Center Inspection and contractor has liability.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...