Jump to content

AndhraBullodu

Members
  • Content Count

    784
  • Joined

  • Last visited

Reputation Activity

  1. Love
    AndhraBullodu reacted to Andhrudu in Single ga veldam 175 seats and 25 MPs   
    Again again reiterating 
    Unemployed youth 24-32 .
    Belive me Tuglak gadi raktham tagadaniki ready ga unnaru. 
    Okka notification ledu 
    DSC , Group 1 2 , SI Constable , PS VRO 
    Masters ki CBN 35,000 k ichevadu 
    Now 0 
    Fake recruitment tho sachivalayam nimpesadu 
    TDP all notifications two times ichai i am live example who attempted Group 2 twice and 1 once 
    Elections mundu i will meet big leadership to setup youth meeting 
    Tuglak gadi fake jobs buildup telipovali 
     
  2. Like
    AndhraBullodu reacted to Raghu NTR in Raghu Ramakrishna Raju   
  3. Like
    AndhraBullodu reacted to bharath_k in Raghu Ramakrishna Raju   
    Atleast expose chestunnadu gaa.   ade kavalasindi. 
    Jaggadu C.M gaa vunanta kalam ....  state anedi ***** aipotune vuntundi.  Edi known fact.  
  4. Like
    AndhraBullodu reacted to fan no 1 in Raghu Ramakrishna Raju   
    Ee bail raddaite lanti kalalu evaite vunnayo, nabhu-nabha.  
  5. Like
    AndhraBullodu reacted to Uravakonda in Raghu Ramakrishna Raju   
    Thanks for keeping all his media videos in one thread. Daily YouTube lo vethakalsina pani thagginchav.
    But, 99tv videos akkarledhu. Adhi PSPK dhi, manakendhuku aa TV hits. Adhi 
  6. Like
    AndhraBullodu reacted to pradeep01 in Krishna River Management Board   
    flexi lu veyali Rayalseema lo .. Jagan and KCR working ,  they working towards to stop water to Rayalaseema ani 
  7. Like
    AndhraBullodu reacted to sonykongara in Amaravati heart project   
    E design kosam konni vandala votes vesanu happy ga undi ede final ayyindi..
     
  8. Like
    AndhraBullodu got a reaction from Yaswanth526 in APNRT   
    ikkadae DB lo  @baagunnara /  @Yaswanth526 anukunta (aa paina message lo Sep 22nd post ae), free training dhi pedite, nenu APNRT lo sign up ayyi (na post kooda ee page modhatlonae undhi), python training ki register ayya. appudu ventanae email lo chepparu, batch full ayyindhi, taravaata batch samyaalu choosi email pamputham ani.
    ninnae anukuntunna, enti inka pampaledhu 3 nelalu ayina kooda, vadilesara ? management sarigga ledhemo, ila ayite ela anukunna.
    theera choosthae ippude email vachindhi. repat nundi training start ani, nenu enroll ayina python ki, samayam mariyu link kooda icharu antharjaalam lo choodataaniki.
    repatnunde python sikshana modhalu anta. kummuthunnaru assala veellu, "nijamga Naipunyaabhivrudhi lo manollu Na Bhootho Na Bhavishyath".
    evarikanna python sikshana meedha asakthi unte PM cheyyandi, link pamputha.
  9. Like
    AndhraBullodu got a reaction from Hello26 in APNRT   
    ikkadae DB lo  @baagunnara /  @Yaswanth526 anukunta (aa paina message lo Sep 22nd post ae), free training dhi pedite, nenu APNRT lo sign up ayyi (na post kooda ee page modhatlonae undhi), python training ki register ayya. appudu ventanae email lo chepparu, batch full ayyindhi, taravaata batch samyaalu choosi email pamputham ani.
    ninnae anukuntunna, enti inka pampaledhu 3 nelalu ayina kooda, vadilesara ? management sarigga ledhemo, ila ayite ela anukunna.
    theera choosthae ippude email vachindhi. repat nundi training start ani, nenu enroll ayina python ki, samayam mariyu link kooda icharu antharjaalam lo choodataaniki.
    repatnunde python sikshana modhalu anta. kummuthunnaru assala veellu, "nijamga Naipunyaabhivrudhi lo manollu Na Bhootho Na Bhavishyath".
    evarikanna python sikshana meedha asakthi unte PM cheyyandi, link pamputha.
  10. Thanks
    AndhraBullodu reacted to baagunnara in APNRT   
    Got below email:
    Free IT Training
    To create better employment opportunity to NRT's. APNRT offers world-class IT training for all members free of cost in partnership with Kelly Technologies.
    Starting September 23rd.
    Courses covered: Data Science, AWS, Block Chain, Artificial Intelligence, Python etc. 
     
  11. Like
    AndhraBullodu reacted to ravindras in SAGAR right&Gundlakamm :18 lakh acres golden days very soon   
    proposed lift irrigation project lift 7,000 cusecs.  any project requires assured supply of water.if water supply stops in the middle/last stages of crop farmers don't get required yield.  yes, in this year we got good inflow from munneru.
    if we transfer 11,500 cusecs water for 24 hours it is equivalent to 1 tmc
    floods from munneru won't be more than a month. this year we lost 40 tmc. out of 40 tmc with 7,000 cusecs lift capacity we can utilize 30*7000/11500 = 18 tmc . we can store 10 tmc in  vykuntapuram barrage . make it total 28 tmc . this year is best year since 2014 . we can't expect same water availability in every year
    polavaram spillway and coffer dam will be completed by may 2019. polavaram rmc discharge capacity at head end is 17,500 cusecs. from june 2019 polavaram rmc discharge water at the rate of 17,500 cusecs ( discharge rate at polavaram head with bed level width 85 meters).  around 3.2 lakh acres will be irrigated along polavaram rmc. 11,500 cusecs(discharge rate at polavaram tail with bed level width 73 meters) will be reached to pavithra sangamam near prakasam barrage. even if no farmers along the polavaram rmc don't use water , still 11,500 cusecs will be reached to prakasam barrage.
    polavaram rmc width is 85 meter at head (near polavaram) and 73 meter at tail(near prakasam barrage)
    https://www.deccanchronicle.com/nation/current-affairs/250816/polavaram-right-canal-to-be-ready-by-july-2017.html
    i will give one analogy you have two pipes with different diameters. both pipes are connected .assume one pipe with 2 meters diameter another pipe with 1 meter diameter. try to send water from one end to other end at maximum possible rate. water discharge capacity will be decided by pipe with smaller diameter.
    another example 1 liter  kinley water bottle . kinley bottle diameter is high at the bottom and middle sections . bottle width is lower at top section.  when you drink water from kinley water bottle, dicharge will be at the rate of top section. if you want more discharge remove top section(cone section) of bottle and try to drink water from bottle. same concept  apply to any canal.
    any canal in general  will be build in trapezoidal section. water discharge capacity decided by bed width, width at top, depth , gradient of canal(mean sea level at head end to mean sea level at tail end and length of canal).  if there are curves in canal then canal discharge capacity will be reduced .this is the one of the reason canal width is more at curves. 
    gradient =  (start point height - end point height) / distance between two points . in general canal gradients in the ratio varies from 1: 5000 to 1: 10,000
    you mentioned chintalapudi lift  is plus. chintalapudi lift canal is build for serving upland areas of westgodavari, krishna districts , nsp left canal 3rd zone in andhra pradesh.  chintalapudi lift canal is not parallel canal till prakasam barrage(or pavithra sangamam). cbn plans to lift water from chintalapudi lift canal to polavaram rmc  near Kovvurupadu village in west godavari . once polavaram cofferdam is completed water will be discharged through gravity to polavaram rmc with full capacity. there is no need to lift water from chintalapudi canal to polavaram rmc. suppose water is lifted from chintalapudi lift canal to polavaram rmc which is already carrying water with full capacity, water will be spillover to nearby fields . this water won't reach prakasam barrage.
    as per my knowledge  polavaram rmc cannot discharge more than 11,500 cusecs to prakasam barrage. these 11,500 cusecs are required for krishna delta to irrigate fields at tail end of krishna ayacut canals.
    my question is where we get 7,000 cusecs for proposed project out of 11,500 cusecs at prakasam barrage. can we depend just on flood water from munneru which is flowing only one month.
    if water is released to krishna delta using on and off method, then proposed lift irrigation project is useful for  irrigating dry crops in nsp right canal and providing drinking water to guntur , prakasam district. if nsp right ayacut want to cultivate paddy crop this project is not enough. 
    anyway this project is interim arrangement for godavari penna link.  
    in my opinon,  godavari penna link needs to started with maximum possible capacity immediately after completing polavaram. we can't delay anymore . atleast if cbn acquires land for main canal , bollapalle reservoir asap it will help  us in not increasing land acquisition costs. land acquisition cost becomes biggest bottleneck for any project. 
    cbn needs to complete godavari-penna first takeup  amaravathi - anantpur expressway later .otherwise land acquisition cost will increases enormously for link canal which makes it impossible to acquire project.  before vajpayee building national highways land prices are around 2 to 3 lakhs in fertile westgodavari districts . now it costs increases badly. db members in guntur,praksasam ,nellore can ask their parents about land prices before 1999.
    i wrote to pmo around 4 times that help ap on polavaram, godavari-penna . i  asked them not to start amaravathi-anantpur expressway until completing godavari-penna link . 
  12. Like
    AndhraBullodu reacted to sonykongara in Kondapalli Fort & Mulapadu   
  13. Like
    AndhraBullodu reacted to sonykongara in Ramayapatnam Port   
×
×
  • Create New...