swas got a reaction from Dravidict in polavaram
gates ok what about blocks?? enni complete ayayi??
30 days for fitting 1 gate anta but modern machinery vasthe 10 days/gate fit cheyochu anta
I think by november machinery ni akada mobilize cheyali appude emana use. we need to fit 2 gates for every 10 days appudu 6 gates/month ante minimum 9-10 months lo gates fittings avutayi almost a year anukovachu
But before november atleast 15-20 spillway blocks ready cheyali for fitting gates appudu people will get known how tdp working hard ani edo 2019 ante waste as fast as we can we can show people
inkoti main ga coffer dam tho 60tmc storage cheyochu
idi inka start kaledu so 1st we need to complete it but mobilize it to good contractor as subcontract appude use
Even coffer dam ayina sare inka left canal ki vache tunnels inka 40%+ avali adi evaru cheyadam ledu and linings cheyali adi kuda cheyaledu ivi anni avali ante minimum 2020 avochu emo ani naa doubt. But atleast coffer dam kattali and we need to complete left canal by next may and tunnels appude coffer dam valla use leka pothe nothing use
-
-
swas got a reaction from ChiefMinister in Vijayawada Adventure Club
Every disrict head quarters lo festivals pettandi like vijayawada festival ani stalls petti local products ni encourage cheyandi.
Guntur festival
Vizag festival
,,,,,
deni valla chala use and local products ni easy ga market cheyochu with low cost
-
-
swas got a reaction from venkat24@NTR in Srisailam Project
Tungabadra ki inflow increased 40000+ hope ikada flow increase ayi dam fill ayithe chalu Nagarjuna sagar kuda full avutundi
-
swas got a reaction from Seethayya in floating hotel ga INS Viraat ship ?
Main ga hotel rooms medium to high costs pedithe bagundu i know cost of room per day will be in 1000's but minimum range to corporate rooms ki difference unte it will be nice we can also stay for one night in a year
-
swas got a reaction from Prasadr in polavaram
If CBN concentrates on Polavaram every day 10 min chusthe chalu using drones work speed will increase 100 times more.
Just work ekada tavvutunaru entha avutundi, today akada entha avutundi reports real time monitoring chesthe chalu. Even better flood lights, roads vesi all flood lights ki cameras fix chesi how many trucks, proklanors, men at work,... chusthe every day 10 min is more then enough. It is better to give power connection to polavaram from all sides and trucks,... night time 3 shifts works cheyisthe emana use,
Hourly updates cheyisthe chalu super speed avutundi. Better sept last ki works start ayee time ki sand lifting ki 3rd party ki ichi 3 companies ki ichi per shift each company must dig 1lakhs cusecs ani target pedithe chalu per day 3 lakhs cusecs sand lifting.
In 100 days 3 crores sand lifting cheyochu.
Till now inka 6+ crores tavvali ila 3 companies ni dimpithe 200-300 days lo motham complete cheyochu. Better use this year september to may next year. If 1 year lo complete chesthe we can concentrate on Spillway and spill channel works speed up cheyochu one by one.
Elago Baver and L&T will take care of Rockfilldam
-
swas got a reaction from Suresh_Ongole in New Airports
Airports ante only passengers ee kadu if we signoff trade/exports/import documents with other countries we can use airports for exports/imports deni valla airports will hit gold and easily 1000's of crores income to govt is possible from this.
-
swas got a reaction from baagunnara in pattiseema
http://core.ap.gov.in/CMDashBoard/UserInterface/Irrigation/IrrigationCommonReport.aspx
Click on Barrages tab
For godavari delta going good already 29+ used but worst thing is 800tmc wasted into sea
-
swas got a reaction from subash.c in polavaram
Polavaram AP deficit lo ki poyina parledu 5000 crores/year appulu techi anna kattali
This november 2016 to May 2017 is key for polavaram max works complete chese la plan cheyali.
If we can complete spillway earthworks+concrete idi chalu 2018 or atleast 2019 may ki oka shape vachinatle polavaram dam ki.
Forget about rehabitation mundu dam kattaka slow ga chesukovachu
Already 450-500tmc wasted in 2 weeks andulo oka 100tmc ni divert chesina chalu we can save Krishna delta ki alternative water ichi srisailam nunchi water ni Rayalaseema ki divert cheyochu easy ga.
For all this kastamo nastamo better AP govt if they can bear 10,000 crores in 3 years AP may get 2500 crores from polavaram electricity nunchi 4 years lo re-pay cheyochu.
-