పోలవరం - నాటకాలు అపాండోరోయ్....AP ప్రజలు దేనితో కొట్టాలి అసలు ఈ బ్యాచ్ ని


AnnaGaru

Recommended Posts

ఆహా ఏమి జీవిస్తున్నారు ర ఒకొక్కడు cost escalation ani ........ మరి ఇదేంటి ర? అసలు మీ డ్రామా మీకైనా సిగ్గు వెయ్యటం లేదు?

* Sarovar DAM is little bigger than Polavaram but look at every year estimates jump......08 it was 30,000 and now jumped to 1 Lakh crore.

* Remember POLAVARAM except R&R the total cost escalation is roughly 5000 K+...

POLAVARAM: 2011 to 2017 clear factors even a dumb fellow can see why non R&R escalated little

- 2011 estimates were done without any DESIGN study...who will give design study costs and soil study? Remember we had to do NEW studies with German,China,Australia teams as the rock was too deep for ground strength

- 100m deep diaphram wall was more than 2011 estimate

- Jet groundig was not estimated in 2011

- SPILLWAY wrongly estimated(even CAG pointed that) and now that added additional cost

- in 2011 estimate, DUMB axx estimated only dam matti digging cost and NOT DUMPING that far away costs...coming to reality 12 crore cubic meter "matti" was moved to 10-14 KM far away...Even on that 12-14KM distance cost escalation SAKSHI(pentapati pullarao&A2 gangmember) batch put NGT case even on that......

- 2011 missed COMPLETE"matti" transport costs for 12 crore cubic feet

- 2+ years they did not handover project land to TRANSTROY and that let contractor cost escalation

- TRANSTROY quoted for 15% less and it is not CBN&AP mistake

- Who will do aqueduct&bridged on LEFT&RIGHT canals which was never done? only 65% RIGHT matti work was done in patches ZERO lining&aqueduct

- Who will do canal lining for both RIGHT&LEFT at new costs?

 

ఇది చూసి చచ్చి పోండి ర 

1) SAROVARM DAM started 56 years back and some minor works are complete and main works started in 2006....

 

- 2010 estimate 33,000 crores

- Spent 45,000 crores by 2014 and not even DAM complete and estimates jumped every month

- spent 52,000 crores by 2017 early and only almost DAM(still some works left) and some partial canal complete

:clickhere:

- 2015-16 estimates 80,000 crores http://www.sardarsarovardam.org/fileman/Uploads/R E 2015-16.pdf

- 2016-17 estimates JUMPED to 97,000 crores http://www.sardarsarovardam.org/fileman/Uploads/R E 2016-17 new.pdf 

- There is talk that it goes upto 1.3 lakh crores soon

 

****** LOOK AT DAM costs jump every year where as for 5000K kukka edpudu roju(see the factors above).....NARMADA DAM COSTS ESCALATED EVERY YEAR even after construction started..

 

 

Link to comment
Share on other sites

unlike POLAVARAM DAM part has very less land acquisiton

 

POLVARAM DAM land acquisiton= 65000 hectares

NARMADA DAM= ONLY 11000 hectares and also wass done already long back

 

* Yes, Narmada has more canal length but that estimated are now jumping every year by 15-20%

 

GUyCNIj.png

Link to comment
Share on other sites

ఇప్పుడు చెప్పండి అసలు  underground  వర్క్స్ లేకుండా పోలవరం కట్టల?

 

LOOK AT 2012 JALAYGNAM inspection SLIPPER SHOTS on DECOIT things in 2012 middle report.....

- Same design without "underground study or grouting e.t.c" awarded to TRANSTROY....Now tell CBN if he can build a 50,000 cuesecs dam

CBN done new studies with China,German,Australia and Netherlands teams then came the SAFETY new things

 decoit kind of DAM building without any undeground works study&grouting works(which CBN has bring later)

 

W8xitT9.png

Link to comment
Share on other sites

పోలవరం ని డెకాయిట్ గాల్లో 35 lakh cusecs అని గాల్లో  estimate చేసాడు.. కానీ అది ఒక మహా ప్రవాహం 50 lakh cusecs లేకపోతె మహాప్రళయం ర అని మార్చారు ...

ఇప్పుడు చెప్పండి 35 lakh cusecs ki కట్టాయ్ మంటారా?

 

u5U553X.png

 

Link to comment
Share on other sites

దుర్మార్గులు అసలు కనీసం అంత దానికి డిజైన్ స్టడీ కూడా చెయ్యలేదు ....ఊరికే మట్టి పనులు మాత్రం చేసుకున్నారు 

ఇప్పుడు చెప్పండి CBN ఇంటర్నేషనల్ studies with China,Australia,German,Russia and Netherlands teams లేకుండా  కట్టాయ్ మంటారా?

 

 

qAl1ziY.png

 

W8xitT9.png

Link to comment
Share on other sites

KL RAO lanti expert warned about PRESSURE of POLAVARAM DAM water in that soil will cause COLLAPSE OF DAM not having technology at best

ఇప్పుడు చెప్పండి grouting,100m undeground work, soil tests, international design studies లేకుండా  కట్టాయ్ మంటారా? డెకాయిట్ కి KL RAO

చెప్పిన పోలవరం చెప్పిన డేంజర్  బాగా తెలుసు అందుకే ఎప్పుడు డిజైన్ మీద concentrate చెయ్యలేదు ....

అన్ని ఉన్న పులిచింతల till he dies was kept on HOLD...

 

ఇప్పుడు చెప్పండి GERMAN LATEST TECHNOLOGY BAUER లాంటివి  లేకుండా  కట్టాయ్ మంటారా?

 

https://sites.google.com/site/shivajirao32/polavaramdamburst

 

Link to comment
Share on other sites

వద్దురా అది limestone  సాయిల్ అని చెప్పిన 600 క్రోర్స్ బూడిదలో పోసాడు డెకాయిట్ 

ఇప్పుడు చెప్పండి DECOIT గాడి లాగా అసలు బేసిక్ సాయిల్ టెస్ట్స్ ,స్టడీ లేకుండా కట్టడమా?

 

 

otti.jpg

Link to comment
Share on other sites

పెర్మిషన్స్ అన్ని తెచ్చాము అంది పెద్ద అబద్దం.....మట్టి పనులు స్టార్ట్ చేసుకోవటానికి బేసిక్ పర్మిషన్ తెచ్చాడు అంతే...అది లేకపోతె మట్టి పని కాంట్రాక్టు ఇవ్వలేరు .......తన వారికీ  కాంట్రాక్టు ఇవ్వటానికి సబ్మిట్ చేసిన ఫేక్ పెర్మిషన్స్ తో కోర్ట్ లో మనకి దెబ్బలు పడ్డాయి 

 

FACT IS EVEN TODAY we are renewing pERMISSION YEAR BY YEAR FROM ENVIRONMENT MINISTRY

 
 
100% అల్ పెర్మిషన్స్ ఉన్న ఇంటర్నల్ పులిచింతల మొబిలైజషన్ అడ్వాన్స్ ఇచ్చి ఆపేసాడు బ్రతుకు ఉన్నంత వరకు లిటిగేషన్ పెట్టి 
 
Link to comment
Share on other sites

Good night all.....please SHARE&SPREAD these facts for the sake of our State....otherwise we are at risk .....DECOIT&PUSHAPAM traitors mana state ni nakinchestaru..... 

 

Feeling SAD that TDP spokespersons can't even share and explain these facts that are in Legal documents......Don't get me wrong many TWITTER perople are doing good job than TDP official persons in explaining facts....

 

r6O0w.jpg

Link to comment
Share on other sites

54 minutes ago, AnnaGaru said:

Good night all.....please SHARE&SPREAD these facts for the sake of our State....otherwise we are at risk .....DECOIT&PUSHAPAM traitors mana state ni nakinchestaru..... 

 

Feeling SAD that TDP spokespersons can't even share and explain these facts that are in Legal documents......Don't get me wrong many TWITTER perople are doing good job than TDP official persons in explaining facts....

 

r6O0w.jpg

Anna.. miru oka ppt laga or Video laga thayaru chesthe we can debate with Jaffas.. 

Link to comment
Share on other sites

9 hours ago, KaNTRhi said:

Anna.. miru oka ppt laga or Video laga thayaru chesthe we can debate with Jaffas.. 

I will do PPT bro....

Very basic question to , How center&Jaffas expecting a project like polavaram to be built 

1) with no study(just imaginary) on safety on how to construct(See above where no design work done before CBN)

2) Not estimating undeground works at all (see below CAG asking how they missed that in project estimate)

3) Wrong estimation for spillway of the project(35 lakh vs 50 lakh) (See above)

4) 12 crore cubic meter  "matti" dumping 10KM away was totally missed in estimate.....Pentapati pullarao(Sakshi) tried to stall POlavaram even after CBN govt started dumping that farway showing that "matti" as poisonous

there are many more and CEnter playing dramas

CAG statement in 2012 year end pointed the very basic "undeground work" missing for DAM..

W8xitT9.png

 

 

Link to comment
Share on other sites

Roju bjp galli leaders ki lekkalu cheppadaniki ready ayyadu ga cbn, mari kottinchukodaniki siddapadinaka mallee noise enduku bro..

vallu wntha isthe antha teeskundam.. state budget lo kattukuni taravatha reinbursement ki oppukunna rojee manam badhapadali.. ippudu idantha waste.. 

We are ready to take orders from the north, thats how it runs here...

Link to comment
Share on other sites

31 minutes ago, Seniorfan said:

Estimate anedhi perigedhe kaani thaggedhi vundadhu....current estimate peragadani guarantee vundha?

We can guarantee unless there are no pushbacks from central govt and at the same time if nature favors us by not creating hurdles - 

 

because of the ferocious flow of River Godavari - this project is tagged as a Hercules effort and one of the great efforts. 

 

And more over CBN like task masters need to be given free hand and full authority. Should there be any corruption central govt always has CBI ED etc ... one thing to keep in mind that CBN will not do blind corruption as he is fame craving person than wealth craving 

Link to comment
Share on other sites

9 minutes ago, DVSDev said:

one thing to keep in mind that CBN will not do blind corruption as he is fame craving person than wealth craving 

e age lo a manishi only dani kosame tapistunadu......tappu emundi dntlo papam anta kasta padatadu....

ippudu center&ntiti review lo Polavaram lo corruption anedi trash......

 

DAMS lo center inspection untundi/margin takkuva responsibility ekkuva ane DECOIT gadu eppudu vati joliki pola batiki unnata kalam....POlavaram ki 3 teams pettaru inspection ki....

vadu PULICHINTALA DAM ni kooda batiki unnanta kalam apesadu anni permissions unna kooda....vadu JALAYAGNAM modalu pettindi first ade fistat apesindi kooda ade.....

kani devadula e.t.c ani matti eetti 7000 crores budidalo posadu...gorakallu ani cheppi "limestone" soil lo 10 TMC reservoir kattaru adi ippudu scrap situation almost...

Link to comment
Share on other sites

6 minutes ago, AnnaGaru said:

e age lo a manishi only dani kosame tapistunadu......tappu emundi dntlo papam anta kasta padatadu....

 

kani devadula e.t.c ani matti eetti 7000 crores budidalo posadu...gorakallu ani cheppi "limestone" soil lo 10 TMC reservoir kattaru adi ippudu scrap situation almost...

True bhayya - intha kasta Pade manishi ki sahakaaram andinchaalsindi poyi raajakeeyam chestunnaaru - state prayojanaalu aney di kooda marchi poyi maree darunam gaa thayaaru ayyaaru oka set of people - mana covert DB sodarulu vetakaaraalu chesthunnaaru thoo deen thalli ilaanti janam ye jaathi lo kooda puttakoodadu saami ?????? 

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...