Jump to content

`No structural damage to OGH heritage block'


swas

Recommended Posts

http://epaperbeta.timesofindia.com/Article.aspx?eid=31809&articlexml=No-structural-damage-to-OGH-heritage-block-15082015006029

 

`No structural damage to OGH heritage block'
 
Hyderabad:
TIMES NEWS NETWORK

 

 
 
Experts have given their verdict: there is no structural damage in the heritage blockbuilding of Osmania General Hospital.

In a detailed report released in the city on Friday, members of Indian National Trust for Art and Cultural Heritage (Intach), while stressing on the need to “protect and preserve these important facets of cultural heritage and human civilization“, strongly recommended the rehabilitation and restoration of the historic structure “in consonance with the architectural aesthetics and ambience of the original design“. Demolition, they reiterated, was out of the question. Listing out the works that the block needs, the committee, comprising structural engineers, conservation architects and experts from other related multi-disciplinary fields, suggested ways of enhancing the lifespan of the block by another 100 years or more.

Re-plastering ceilings with “appropriate mortar mix“, repairing damaged walls using “traditional ingredients and techniques“, fixing the issue of waterlogging on the terrace by opting for “polymerbased flexible waterproofing systems without disturbing the structural stability“ and resorting to coating surfaces with “fungicides and weedicides to avoid the recurrence“ of biological growth, were some of the recommendations put forth by the team in its final report.

Finding faults with the JNTU report, which limited the life of the heritage building to just about five years post repairs, the Intach `Inspection Report' claimed that the JNTU study did not make it clear “as to what evidences or presumptions led to this conclusion“. “The report categorically mentions it being based on visual inspection. Allocating a definite timeframe re garding its age without adequate monitoring, documentation, analysis and testing of materials and their strength is arbitrary and presumptuous“, the Intach team stated.

It went on to add how the flaking of plaster in wet areas, wearing out of floors and the acute issue of dampness, among other concerns, were all rectifiable ­ through use of appropriate raw material for its repairs and better maintenance.

“And despite all this, the cost of refurbishing the heritage block would work out to be much cheaper than the total price of pulling it down,“ said heritage expert Sajjad Shahid, also the co-convener of In tach (Hyderabad chapter).

He added: “All the talk around heritage in the city is related to their destruction; there is no effort made to conserve them. Such is the plight that three years after its last term, there is still no move to reconstitute the Heritage Conservation Committee. Even the long-pending demand for an Urban Arts Commission, is gathering dust.“

Echoing similar sentiments, city architect G Srinivas Murthy said how it was pertinent to protect the over 90-year-old structure that had stood the test of time.

“There is a lot of open space and encroachments around the old block. These can be usedremoved to make way for multi-storied buildings, in case the authorities need to increase the space available within the premises so as to improve healthcare facilities for patients.“

In fact, while recommending the construction of “modern services and support systems“, while not undermining the “character of the heritage building“, the Intach report highlights how these structures “should incorporate the latest principles in the design of hospital buildings to take care of requirements of bio-medical infrastructure, electrical, sanitation, environment and other safety aspects“.

15_08_2015_006_029_010.jpg
 

 

Link to comment
Share on other sites

world antha vintage buildings ni save chese pani lo unte KCR matram reverse,... neebonda.gif

 

 

Assembly heritage buildings list lo ledu but road avatala metro veltundi ani dani alignment marpu ani cheppi metro ni munchadu ikada scene reverse... inka charminar ni kuda kulustam ani statements .

Link to comment
Share on other sites

Assembly heritage buildings list lo ledu but road avatala metro veltundi ani dani alignment marpu ani cheppi metro ni munchadu ikada scene reverse... inka charminar ni kuda kulustam ani statements .

emo vaadi paade,.. tingari edavalu edava dappu kottukovatam thappa okkatante okka action kuda promising ga kanapadaledu, mari naa kallu lopama asalu aa manishe lopamo ardam ayyi chaavadu

Link to comment
Share on other sites

emo vaadi paade,.. tingari edavalu edava dappu kottukovatam thappa okkatante okka action kuda promising ga kanapadaledu, mari naa kallu lopama asalu aa manishe lopamo ardam ayyi chaavadu

 

 

already govt deficit lo ki poyindi . This year 1st time hyderaabd Ghmc is going into deficit anta inka motham payeee .

 

Manam inko 3-4 years lo surplus ku vastam but vellu mana position ni dati ekadiko velipotaru appatiki

Link to comment
Share on other sites

already govt deficit lo ki poyindi . This year 1st time hyderaabd Ghmc is going into deficit anta inka motham payeee .

 

Manam inko 3-4 years lo surplus ku vastam but vellu mana position ni dati ekadiko velipotaru appatiki

GHMC deficit endi,.. ee information oka sari cross check chesukovaalemo uncle,. 

Link to comment
Share on other sites

GHMC deficit endi,.. ee information oka sari cross check chesukovaalemo uncle,. 

 

 

Idigo uncle pakka information idigo

 

2578 crores will come from taxes every year.

 

Road development kosam 4051 crores ready cheyamani govt chepinidi ghmc ni. 

20 multi level flyovers kattadaniki 2631 crores
lands tesukovali 20,000 crores kavali for multilevel constructions.
Inka highlight emiti ante govt or ghmc money 1st ivaru anta for constructing fly overs, 1st companies money petti kattali appudu 10 years lo govt 10 installments lo pay chestundi.
 
Ghmc nunchi rtc ki 200 crores ichina govt from ghmc
swatch hyderabad kosam 200 crores karchu pettindi govt from ghmc
harithaharam kosam 150 crores from ghmc
chivaruku double bed room houses kosam 450 crores from ghmc
5rs bojanam kosam rs.37 crores
multipurpose halls kosam 60 crores from ghmc
modern markets kosam 70 crores from ghmc
 
Already 98% of Ghmc budget goes to pay salaries day to day activities.
 
This time Ghmc is going to be deficit in coming year due to huge plans of 30,000-40,000 plans. vache income 2578 crores came from taxes but chepe plans, govt schemes kosam ghmc karchu pettu kuntu pothe 1000's of crores deficit lo ki velli deficit lo AP ni minchi potundi coming 5 years for sure
 
 
Already 1 month lo 3600crores overdraft chesi TG govt slowly went into deficit ippudu Ghmc kuda velipothe day to day activities of hyd Ghmc will be stopped due to lack of funds.
 
Till 1 year TG govt is not given single rupee reverse ga ghmc funds vadestunaru. ilage unte inko 1 year lo deficit lo ki potundi govt,
Link to comment
Share on other sites

hmm ippude chosotha bro,.. ee issue konchem detailed ga chadavaalsinde, endukante Hyd laanti city definit loki povatam endi erri etakaaram kakapothe. ee lekkana chaala wrong path teesukundi TG govt. Governance kanna ekkuva dabbulu dobbe alochanalu start chesaru

Link to comment
Share on other sites

hmm ippude chosotha bro,.. ee issue konchem detailed ga chadavaalsinde, endukante Hyd laanti city definit loki povatam endi erri etakaaram kakapothe. ee lekkana chaala wrong path teesukundi TG govt. Governance kanna ekkuva dabbulu dobbe alochanalu start chesaru

 

Ya what u said is correct 

 

no schemes only scams

Link to comment
Share on other sites

Ennenni sketches geesado mukkodu patha buildings anni koolagotti Rameswara rao ki ichedham sites anni ani.

pina video lo clear gaane cheppadu,.. abba,.. hyderabad ni kuda naasanam chestunnaru ga,.. hyderabad di antha bubble business, eppudina blast avvochu. vellu aa bubble ni pullalu petti kelukutunnaru. edava manda,.. 

Link to comment
Share on other sites

pina video lo clear gaane cheppadu,.. abba,.. hyderabad ni kuda naasanam chestunnaru ga,.. hyderabad di antha bubble business, eppudina blast avvochu. vellu aa bubble ni pullalu petti kelukutunnaru. edava manda,.. 

 

Ya Gudlu pette bangaru batu ni champutunaru oka sari padipothe inka malli levadu ippude appudu telustundi

Link to comment
Share on other sites

Ya Gudlu pette bangaru batu ni champutunaru oka sari padipothe inka malli levadu ippude appudu telustundi

andulo Bangalore is expanding with huge pace,.. mari mana Amaravati undane undi,.. antha severe ga impact cheyyalekapoyina entho kontha debba kachitamga tagulthadi,.. anyway,.. akkada public vote vesthene kada vallu gelichindi,.. so thappadu le,.. continue avvalsinde

Link to comment
Share on other sites

andulo Bangalore is expanding with huge pace,.. mari mana Amaravati undane undi,.. antha severe ga impact cheyyalekapoyina entho kontha debba kachitamga tagulthadi,.. anyway,.. akkada public vote vesthene kada vallu gelichindi,.. so thappadu le,.. continue avvalsinde

 

 

Ya amaravati is going to be new destination for companies.

 

50,000 acres forest land denotify chestunaru and again in that land lo 20,000 acres greenery ke istaru babu garu, ante 30,000 acres lo companies will come. 

 

Adi kakunda unna area lo kuda companies tesukostam ani japan and singapore accepted if they given land in lease 

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...