Jump to content

Open market lo power costs as of today


bharath_k

Recommended Posts

Posted

 

today 16.42  rupees / unit 

This is trending like  18, 20 , 22 also  

Jaggadi debbaki sagam power plants maintanance leka mutapaddai,  Commisions kosam kakkurthi padi anni PPA solar/ wind vallani tarimesadu 

 

CBN time lo A.P produced 110% ( 10% extra ) 

Now a days A.P is producing 50%, rest 50% jagga has to purchase with 18 Rs per unit on an avg. 

 

 

image.png.cc3d62dcbf332c3542345e505e324f59.png

Posted

Option unnodu...evadi intiki vaadu solar power pettinchukunte better..intial oka 3 or 4 lacs ayina..long term ee powe meeda dependency taggudi... kaani modi and tuglak lu own power generation ki kooda charges vasulu chesina chestaru...

Posted

Jaggadu evvala 1500 mega watt pwoer konali. 

 

1500 * 10^3(kwh)* (20 rupee purchase -distrubution cost) * 24 hrs   =>    72 crore per day.  

 

monthly anni kalipi =>  2500  crore avvuddi.  

 

Posted

Bijjala gaadu already chestulu ettesadu 

Mostly ... A.P lo vacche week lone power delivery system mottam collapse avvuddi 

 

Posted

Kallam ajay gaadu  38 paise per unit ki manam produce cheyyocchu ani kalalu tega cheppadu.  ( PPAs meeda attack chese time lo ) 

eppudu vaadini teesukocchi unit ki 38 paisa ecchi produce cheyyamanali. 

Posted

Rates for andhra :  Baaga dobbutunnaru jaggadini    16 min --- 20+ max  

1 Mega watthour is 20 tousand . house hold unit is 20 rupees. 

 

image.thumb.png.45f6a838e23b815d706b673556f57d7d.png

Posted

Power save evadiki vadu chestadu. Mee pani uninterrupted power supply ivatam kada.

Btw what happened to solar power/wind power PPAs. Center told that we cannot back off na? Are they still there?

Posted
11 hours ago, Sunny@CBN said:

Power save evadiki vadu chestadu. Mee pani uninterrupted power supply ivatam kada.

Btw what happened to solar power/wind power PPAs. Center told that we cannot back off na? Are they still there?

vallani jaggadu oka range lo torture chesadu.   Kanisam vallaki bayata grid ki  ammukone chnace kooda lekunda  ....  Genco wires kooda cut chesadu. 

vallu eppudo production aapesaru. 

4 rupees ki estamante --- veedu 2 rupees ki adigadu. 

eppudu ***kutoo , bayata 20 rupees ki kontunnadu

 

Posted
2 hours ago, bharath_k said:

vallani jaggadu oka range lo torture chesadu.   Kanisam vallaki bayata grid ki  ammukone chnace kooda lekunda  ....  Genco wires kooda cut chesadu. 

vallu eppudo production aapesaru. 

4 rupees ki estamante --- veedu 2 rupees ki adigadu. 

eppudu ***kutoo , bayata 20 rupees ki kontunnadu

 

Ipdu unna situation ki power kavali kada. Malli resume chesi undochu ga?

Posted
33 minutes ago, akhil ch said:

2014 taravata cbn made Andhra Pradesh a power surplus state in under 20 months anukunta. Jai Jagan 

Jaggadi plan :  PPAs lo 4 rupees ki estunnaru.   

vunna PPAs ni raddu chesi ...  bayata power plants nundi unit 8 to 10 rupees ki konadam.  unit ki 3 rupees pina comission dobbatam.

eppudu demand okka sariga perigi unit 20 rupees aiyyeppatiki ... jaggadiki colors kanapadutnnai. 

 

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...