-
Posts
9,397 -
Joined
-
Days Won
4
Everything posted by AbbaiG
-
MP gari company ki ippinchandi contract Kaliyugam mugise varaku kadutoone untaru
-
Ha..ha.... This will be like the MSP scheme for agriculture. They will set the prices, but blame the states for their failures. Aarogya sri is far better AP should reject this Ayushman BS
-
TDP leaders should do the same. Reject the Ayushaman name and ask them to support aarogya sri. Throw some mud and muck on Modi. Allege undue favors for adani and ambani in the proposed private clinics.
-
Ooooh positive anomalies in Srisailam and somasila catchment.
-
Excellent management ani cheppali. Next 10 days forecast choosi on chesi padesaaru lekapothe 3 days ibbandi padalsi vachhedi. asale initial peak demand time
-
Chintalapudi Lift Irrigation Project
AbbaiG replied to sonykongara's topic in Politics and Daily News
Lift avutundi emo 15th ki Summer lo aite November ki teesukostam to Nuziveedu area ane vaadu gaa Uma. Chintalapudi area land acquisition - big problem -
Chintalapudi Lift Irrigation Project
AbbaiG replied to sonykongara's topic in Politics and Daily News
I think lifting from RMC at guddigudem is temporary. Original design vere anukunta. But not sure -
SAGAR right&Gundlakamm :18 lakh acres golden days very soon
AbbaiG replied to AnnaGaru's topic in Politics and Daily News
routine transfers -
SAGAR right&Gundlakamm :18 lakh acres golden days very soon
AbbaiG replied to AnnaGaru's topic in Politics and Daily News
No tours next two weeks. Chintalapudi structures work very weak. Post chesarugaa Nekkanti transferred to krishna delta engineering team -
SAGAR right&Gundlakamm :18 lakh acres golden days very soon
AbbaiG replied to AnnaGaru's topic in Politics and Daily News
ఇంకొక రెండు మూడేళ్లు కష్టాలు తప్పవు ఏమో పోలవరం పూర్తి ఐతే సీన్ మారిపోతుంది కృష్ణ-గోదావరి మెగా డెల్టా ఈజ్ కమింగ్ -
As per the book, at one instance the maximum flow into Srisailam touched 26 lakh cusecs. Probably for a very short duration. But everybody panicked. Overflow ayipotadi ani kangaru pettaru TV channels
-
From the Engineers who managed the 2009 flood (PDF) http://www.indiawaterportal.org/sites/indiawaterportal.org/files/Managing historic flood in the Krishna river basin_ An experience of averting catastrophe_APWRDC_2009.pdf
-
Chintalapudi Lift Irrigation Project
AbbaiG replied to sonykongara's topic in Politics and Daily News
Compensation entha ki oppukunnaru. Any idea? Polavaram RMC tho equal ga compensation ivvamani adugutunanaru ani telusu. Godava settle ayyindaa? -
North east monsoon
-
SAGAR right&Gundlakamm :18 lakh acres golden days very soon
AbbaiG replied to AnnaGaru's topic in Politics and Daily News
Not possible if you depend 100% on Godavari water But if they are going to supplement it with some water supply from sagar late in the season, plus rainfall - could be possible. But still lot of engineering and new water management practices will be required. -
What's forecast for Oct, Nov? Past 3 years AP, orissa dry cyclone season
-
Chintalapudi Lift Irrigation Project
AbbaiG replied to sonykongara's topic in Politics and Daily News
Chooddam Partial gaa start chesina chintalapudi area lo panulu speed penchutaaru. -
Chintalapudi Lift Irrigation Project
AbbaiG replied to sonykongara's topic in Politics and Daily News
Sunday vellam. Canals almost done. Structures work peddaga start cheyyaledu. Right canal laga, temporary gaa chestaremo. Guddigudem Lift visit cheyyaledu. So no idea. -
If someone wants to track, AJ west godavari edition reports water being released from Godavari daily. They added pattiseema this year. Not 100% reliable but does the job On the 2nd page
-
6300 being released from 18 pumps 4.4 tmc lifted as of yesterday
-
Hmmm.... waiting Monnati varaku fry chesindi, 2 days nundi udakestondi
-
Central University in Anantapur District
AbbaiG replied to RKumar's topic in Politics and Daily News
ఈళ్ళ మామ బర్రె ల్యాండ్ అప్పజెప్పలేదని కొన్ని రోజులు, ప్రహారి గోడ కట్టలేదని ఒక సంవత్సరం, డీ పీ ఆర్ అవ్వలేదని ఒక సంవత్సరం, టెండర్లు పడలేదు అని ఒక సంవత్సరం, గ్రీన్ ట్రిబ్యునల్ అనుమతి కి ఒక సంవత్సరం ఈళ్ళ సార్థం, ఈళ్ళ పిండాకూడు ఎన్ ఐ టి కట్టేశారు, ఇప్పుడు మీ మామ బఱ్ఱె యూనివర్సిటీ కట్టండి -
Yeah NIT pakkana vastunnayi. Pongal target on schedule anukunta Konni towns lo inka start avvaledu, adokkate bad. Greedy employees sabotaging
-
Any idea on the no of applications vs houses sanctioned in nandyal or other towns West lo chinna towns lo kooda 2 to 3 thousand applications extra untunnayi