-
Posts
6,498 -
Joined
-
Last visited
-
Days Won
10
Posts posted by swarnandhra
-
-
source: AndhraJyothy
http://www.andhrajyothy.com/artical?SID=463996
హైకోర్టు బాహ్య డిజైన్ నచ్చలేదు: నారాయణ
14-09-2017 03:02:44అమరావతి: అసెంబ్లీ, హైకోర్టు భవనాల అంతర్గ డిజైన్లు బాగున్నాయని పురపాలక శాఖ మంత్రి నారాయణ తెలిపారు. హైకోర్టు బాహ్య డిజైన్ మాత్రం సీఎంకి నచ్చలేదని తెలిపారు. గురువారం మంత్రులు, ఉన్నతాధికారులతో సమావేశమై తుది డిజైన్లపై వారి అభిప్రాయం కూడా తీసుకుంటామని చెప్పారు. వారు ఓకే చేయగానే దసరా రోజు అసెంబ్లీకి శంకుస్థాపన చేస్తామని తెలిపారు. -
i think the kuchipudi building were the towers..mostly used for business or housing purpose.
yeah, I think you are right.
-
international university can not setup 100% autonomous campus in India. UGC rules do not allow. That is the main problem.
-
emo bro, bane anipistunai.....we have our unique models that goes with Amaravati theme annattu unnai instead of some replica...
Not that these are bad. diamond shaped one might look like a upside down pyramid from front(good). Other one (HighCourt ???) might look like just rectangular building.
There was talk of twin towers in "Kuchipudi" dance posture. what happened to that?
-
ivi top view lo baaguntayi kani mundu nilabadi chuse vallaki antha goppaga kanipinchavemo
-
oh ok,thanks uncle ee roju chala information telusukonna
-
from wher e to where?
you got me before I could delete the post. they are just penstock not tunnels. but odisha power generation on Sabari (Kolab) is through tunnel.
-
aa rojullone antha chain structure build chesara Maharashtra vallu
yeah, amazing feat. because of the height of shivsagar reservoir head, they were able to generate almost 2000 MW total from less water for longer period.
we also have similar multistage generation on Sileru.
-
aina arebia sea ki discharge ayye water ni krishna river ki ela testharu? madyalo ghats vuntay kada mana vallu nijamaga ala letter raasi vunte matram adi cheppina vaadiki sanmanam cheyochu
Kolekwadi dam western end of western ghats lo vuntadi sivasagar eastren end lo vuntadi
Kolkewadi dam is fed from back waters of shivsagar reservoir after power generation through tunnel. that water is used in further stages of power generation. if power generaion is not needed, that tunnel can be stopped and same water can be released to Koyna downstream (to krishna).
-
evadu ee article raasinodu koyna river krishna river lo kalusthadi aite
this river system has multiple dams. one of the dam discharges in to arabian sea (Kolkewadi Dam). main reservoir (shivsagar) discharges in to Krishna
-
So srisailam pai AP ki.... Sagar pai TS ki hakku undha??
For all practical purposes, Srisailam, NS and Pulichinata anni TG control lo ne vunnayi either direct control or through power generators. krishna river management board is toothless. They can drain all these dams if they want. for e.g. from srisailam left bank power generators they can discharge 45000 cusecs (4 TMC/day).
annitikante worst, NS right canal gates control kuda TG ki ivvatam. These canal gates are in AP.
-
your info is correct but looks like there is a typo bro.60 tmc storage vastundi coffer dam tho
when ever it is overflowing both canals ki 1.5 tmc right canal and 8500 cusecs left canal till flow is there pampochu
correct ga use chesthe 60 tmc storage maintain chesthe chalu 70% of water problems solve avutundi
coffer dam never overflows, if it does it is gone. generally, coffer dam hight kante spillway gates are set at lower height. excess water flows through spillway dam.
I remember reading coffer dam live storage (usable without lift) is 15 TMC only. So it can be used as buffer to provide water in a dry spell up to 7-10 days.
-
Do the current flow of right canal do not support for whole krishna delta? (Those 8k cusecs per day)
right canal (gravity) can support delta fully (17k cusecs). pattiseema is only half.
-
-
TG doesn't care for water to lift on krishna. They use it for power generation. Water Oka level (approx 6 tmc) reach Ayina tarivatha power start chesukovatchu ani vundi. It's cheap power (around 2rs) compared to thermal (around 5 rs)
Oka sari power start chesthe within 15 days kali.
Dammugudem- tailpond is the best solution for both TG and AP. May be CBN will try with center once polavaram is in a good shape. (Annagaru ee subject mida clear ga rasaru ee related threads lo)
TG "do" care for water from krishna. lifting water from pulichintala is much cheaper than all his other lift schemes. However, AP division bill gave the water to AP. that stops him from doing so.
Dammugudem-NS tailpond project is gone case. no amount of central pressure can make it happen. It is political suicide for central parties to force it on TG.
-
Polavaram canals manadantlone ga unayi how dora will use that water
manam polvaram nunchi mallinchi pulichintala nimpithe, dora akkada oka lift pettukuni thodukuntadu kada ani. yes, it is possible
-
Ipudu cheyataniki avada
ippudu kashtam brother. best we could do now is to build another barrage down stream of pulichintala and lift water from it to buggavagu. or an aqueduct across krishna river and take water directly to Guntur district. (it is one of the options in Godavari-Penna inter link design).
-
Undedi.... manam todina water ni Dora lagewadu
vallaku gravity dwara water vellavu pulichintala nundi. lift pettukovali.
-
polavaram right canal capacity future kosam penchali,,,
vunna danni penchataniki land acquisiton kashtam avutundi. vere alignment lo kottadi travvali.
-
yeah, Polavaram Right canal ni Pulichintala back waters lo kalapalsindi asalu design lo ne. cost daggara kakkurthi padi natlunnaru. appudu combined state vunnappudu 5-10 km long canal ki TG lo land acquisition pedda kashtam ayyedi kadu. in return 45 TMC storage capacity add ayyedi.
-
even 100 TMC storage is a long stretch considering the cost/cases involved in R&R unless equations change at center in 2019 (only if central govt depends on our MPs support).
looks like 60 TMC is the max we can store without any controversies. That is good enough buffer to support flow during dry spells with-in rainy season (through lifts)
-
East west Krishna ni kanaka yearly 3 crops consistent ga yield chese laga plan seskunte AP revenue ekkadiko eltadi
two crops in existing krishna delta and 3 crops in godavari delta is quite possible. in addition new farming opens up in east, west and krishna district dry lands.
-
Feb to May konchem kastam anukunta - unless you release from Sileru
by end of rainy season there will be 200 TMC in Polavaram. how would that all be gone in three months? Sileru has additional storage thats a different thing.
-
enti pulledi boodida,.. anthantha rates petti rammante vasthaara,.. mana valla kakkurthi ki chivariki aa area peddaga expand avvadu saavadu,..
andukega ilantivi kattali anedi. ee batch antha free or subsidized batch ye kada. vellu anna vastaru mundu. jobs (tourism/medical/education ...etc) create ayithe, cost ekkuva vunna slow ga kontha mandi akkada settle avutaru. just an example, with so many high end medical institutions around there will be huge uptick in medical tourism. countries with single payer insurance like U.K, Canada ..etc nunchi medical treatments ki vacche chance vuntundi.
Amaravati
in Politics and Daily News
Posted
konni nacchaledu sare, nacchina vaatini anna start chestunnara leda Sep 30th?
asalu nijam ga naccha ledo, dabbu leka ila prolong chestunnaro