Jump to content

swarnandhra

Members
  • Posts

    6,498
  • Joined

  • Last visited

  • Days Won

    10

Everything posted by swarnandhra

  1. yeah, too much concrete. rastram antha inkudu guntalu tavvutu, ikkada enti ila?
  2. Rice ki ayithe 2 pantalaki kalipi 10,000 acres ki 1 TMC kavali anukunta.
  3. no Kaza toll gate is on NH16 (previously, NH 5) near Nagarjuna University
  4. I think, most of the consumer energy (normal households) consumption is subsidized. If discoms can reduce the consumption of that type, they can reduce the losses. Discoms charge higher for industrial users (at profit) to compensate for subsidies, transmission losses and theft.
  5. looks like mostly barren land. Why are they opposing? May be picture was taken during off-season?
  6. Who is this article writer? Should have drawn that red line at least close to the coast(if don't have patience to draw the exact path) rather than in bay of bengal. very low threshold for editorial quality.
  7. Swas brother, you got me totally wrong. I was not questioning the validity/use of Pattiseema. Rather, I mentioned it as a reference to refute the premise that we need to build 300 TMC capacity reservoir in west godavari as per option 1 mentioned in Eenadu. Your explanation is actually supporting my point. I also took Mallana Sagar as reference to estimate the land required to build reservoir of that capacity. I was not criticizing either of them. I was questioning the concept of direct linkage of Godavari - Penna i.e bypassing Krishna through aqueduct. Yes, I agree with you on what you said about pattiseema/prakasam barrage.
  8. TFS. This clarifies the question I asked in the other thread about aqueduct. Option 1: Reservoir for 300 TMC? This is probably a typo. Otherwise why do we need that big reservoir to use 375 TMC. Remember we are planning to use 80 TMC from pattiseema with just 2 TMC storage capacity at prakasam barrage. Is it possible to build man made reservoir of that size ? what about land acquisition issues. Already KCR running in to trouble acquiring 20000 acres for 50 TMC storage at Mallanna Sagar. So this proposed new reservoir would need 120000 acres in west godavari. It is unlikely that it ever gets to build.
  9. Sri Venkateswara Veterinary university undi Tirupathi lo kada? Daaniki inthaku mundu Lam daggarlo 367 acres allot chesi danni ippudu agriculture university ki change chesara? veterinary university ki tirupathi daggarlo place lenattu Lam lo enduku allocate chesaru asalu?
  10. Identi brother news ila vundi. Lam lo university petti land chittor dt lo land iste ela?
  11. Probably not needed to have good weather up to aug. 2-3 more weeks vunte chalu. Exterior work will be completed by then. Remaining interior works can be completed irrespective of weather.
  12. inko 3 months padutundi ani news vacchindi one month back. How could they complete bridges/aqueducts so soon? Temporary structures could not hold 8400 cusecs right?
×
×
  • Create New...