-
Posts
9,397 -
Joined
-
Days Won
4
Posts posted by AbbaiG
-
-
7 hours ago, rk09 said:
"Better provision of health care can bring several benefits, from both an economic and wider perspective," Capital Economics said in an August 17 note. "But we doubt that Modicare will have much of an impact."
Ha..ha....
This will be like the MSP scheme for agriculture.
They will set the prices, but blame the states for their failures. Aarogya sri is far better
AP should reject this Ayushman BS
-
TDP leaders should do the same. Reject the Ayushaman name and ask them to support aarogya sri.
Throw some mud and muck on Modi. Allege undue favors for adani and ambani in the proposed private clinics.
-
Ooooh
positive anomalies in Srisailam and somasila catchment.
-
23 hours ago, Uravakonda said:
pattiseema water pumping aapesthunnam annaru kada? malli enti idhi?
Excellent management ani cheppali. Next 10 days forecast choosi on chesi padesaaru
lekapothe 3 days ibbandi padalsi vachhedi. asale initial peak demand time
-
13 hours ago, sonykongara said:
abbayi bro ,kastam antunadu eenadu vadu, ela jarugutunnayi works
Lift avutundi emo 15th ki
Summer lo aite November ki teesukostam to Nuziveedu area ane vaadu gaa Uma.
Chintalapudi area land acquisition - big problem
-
I think lifting from RMC at guddigudem is temporary. Original design vere anukunta. But not sure
-
15 minutes ago, sonykongara said:
alana enduku marcharu
routine transfers
-
1 hour ago, sonykongara said:
bro, emiti sangthi polavaram chintalapudi works ela jarugutunnayi
No tours next two weeks. Chintalapudi structures work very weak. Post chesarugaa
Nekkanti transferred to krishna delta engineering team
-
29 minutes ago, balayyatheking said:
mundhuga chepparuga...water availability ni batti..last year icharu..anthaka mundu bore thone..
ఇంకొక రెండు మూడేళ్లు కష్టాలు తప్పవు ఏమో
పోలవరం పూర్తి ఐతే సీన్ మారిపోతుంది
కృష్ణ-గోదావరి మెగా డెల్టా ఈజ్ కమింగ్
-
1 hour ago, Raaz@NBK said:
Appudu 12 Lakhs Cusecs max ani cheppina.. 13.5-15 Lakhs Cusecs ni tattukunattu gurthu..
As per the book, at one instance the maximum flow into Srisailam touched 26 lakh cusecs. Probably for a very short duration.
But everybody panicked. Overflow ayipotadi ani kangaru pettaru TV channels
-
From the Engineers who managed the 2009 flood (PDF)
-
54 minutes ago, raghu6 said:
Dwaraka Tirumala area lo compensation eppudu istharu farmers ki emann idea Vunda
Compensation entha ki oppukunnaru. Any idea?
Polavaram RMC tho equal ga compensation ivvamani adugutunanaru ani telusu. Godava settle ayyindaa?
-
North east monsoon
-
On 6/21/2018 at 7:32 AM, ravindras said:
i unable to understand when godavari delta requires 12000-15000 cusecs for 10 lakh acres, how 11500 cusecs sufficient for krishna & nagarjuna sagar right canal 13+18 = 31 lakhs acres
Not possible if you depend 100% on Godavari water
But if they are going to supplement it with some water supply from sagar late in the season, plus rainfall - could be possible.
But still lot of engineering and new water management practices will be required.
-
52 minutes ago, mahesh1987 said:
July cover chesthadi ley catchment areas lo back to back low pressure areas next 10 days
but august and september mana season mainly rayalaseema
What's forecast for Oct, Nov?
Past 3 years AP, orissa dry cyclone season
-
31 minutes ago, sonykongara said:
tfs bro ,water vadile chance udha bro August 15 antunadu uma
Chooddam
Partial gaa start chesina chintalapudi area lo panulu speed penchutaaru.
-
24 minutes ago, sonykongara said:
chintalapudi lift irrigation phase 2 works ela jargutunnayi videos unte post cheyyandi
abbayi.g brother konchem cheppandi
Sunday vellam. Canals almost done. Structures work peddaga start cheyyaledu. Right canal laga, temporary gaa chestaremo.
Guddigudem Lift visit cheyyaledu. So no idea.
-
If someone wants to track, AJ west godavari edition reports water being released from Godavari daily. They added pattiseema this year. Not 100% reliable but does the job
On the 2nd page
-
6300 being released from 18 pumps
4.4 tmc lifted as of yesterday
-
1 hour ago, mahesh1987 said:
ap lo heavy rain next week lo vundachu mostly
Hmmm.... waiting
Monnati varaku fry chesindi, 2 days nundi udakestondi
-
-
ఈళ్ళ మామ బర్రె
ల్యాండ్ అప్పజెప్పలేదని కొన్ని రోజులు, ప్రహారి గోడ కట్టలేదని ఒక సంవత్సరం, డీ పీ ఆర్ అవ్వలేదని ఒక సంవత్సరం, టెండర్లు పడలేదు అని ఒక సంవత్సరం, గ్రీన్ ట్రిబ్యునల్ అనుమతి కి ఒక సంవత్సరం ఈళ్ళ సార్థం, ఈళ్ళ పిండాకూడు
ఎన్ ఐ టి కట్టేశారు, ఇప్పుడు మీ మామ బఱ్ఱె యూనివర్సిటీ కట్టండి
- Saichandra, nivas_hyd, nbk@myHeart and 4 others
- 2
- 5
-
On 4/25/2018 at 10:11 AM, Saichandra said:
@AbbaiG bro
Yeah
NIT pakkana vastunnayi. Pongal target on schedule anukunta
Konni towns lo inka start avvaledu, adokkate bad. Greedy employees sabotaging
-
On 3/1/2018 at 2:11 PM, Yaswanth526 said:
నంద్యాల In total 13000 houses .. 1st phase will be finished by Ugadi
Any idea on the no of applications vs houses sanctioned in nandyal or other towns
West lo chinna towns lo kooda 2 to 3 thousand applications extra untunnayi
Kondamodu - Perecherla 4 Lane Road
in Politics and Daily News
Posted
MP gari company ki ippinchandi contract
Kaliyugam mugise varaku kadutoone untaru