Jump to content

swarnandhra

Members
  • Posts

    6,498
  • Joined

  • Last visited

  • Days Won

    10

Posts posted by swarnandhra

  1. no, there is no confusion. I am not advocating/worried existing delta would loose its share. point I am trying to make is 60 TMC diversion is not possible(with existing capacity and resources). numbers are not adding up. these type of hyped up calculations would leave NS right canal farmers dry in the middle of their crop season. we can not simply add 25 days of pattiseema to the 40 TMC overflow at barrage as they both happen at the same time.

  2. 5 minutes ago, sskmaestro said:

    Guys there is some storage at Prakasam barrage (2 TMC ?).... so technically speaking, when Pattiseema motors are 100% operating at 24x7 there is a possibility to feed Both the areas. 

     

    May be, we cannot release to both areas at same time, but it can be done in a switching basis.... NS Right canal’s requirement is around 60-80 TMC.... 

     

    anyways as folks mentioned it’s better to have a permanent and feasible solution.

    Prakasam barrage discharge capacity is close to 17k (krishna east and west delta canals combined). yes, antha oke sari release cheyyalsina pani ledu (west delta starts late), kani enni swtiching/staggered method lo chesukunna pattiseema is not enough for existing delta. why do you think polavaram right canal is designed for 11.5k capacity?

  3. Kommamuru/buckingham canal alone need minimum 6k to reach parchur area. krishna east delta natlu ayipoyi demand taggindi anukunna (from 8k to 3-4k), pattiseema water is barely enough for existing delta throughout its 100 days.

    this year maa narumadi endipoyindi (guntur dist) (we are in the middle of the delta), maa attayya valla natu vesina polam (krishn dst) almost dead ayyindi. pulichintala dead storage lo vunna 0.5 TMC ni vadili krishna east delta ni save chesaru. 

    mabbulni chusi kunda valaka posukune panulu cheste chivariki loss ayyedi janam bad ayyedi govt. 

  4. 4 hours ago, BalayyaTarak said:

    Mana stateki emanna airforce employment lo reserve chestara , cheste gana very good opportunity for people to look beyond these routine tech jobs

    antha scene emi vundadu. aa suryalanka air force base naa chinnappati nunchi chustunna. 1300+ acres lo beach ki ankuni vuntundi. okka helicopter kuda vundadu. just a Radar station and 50-100 employees. oka 4 km long beach lo ki kuda civilians ni allow cheyyaru. 

  5. 25 minutes ago, katti said:

    //As per current traffic data, Vijayawada airport handled 3.98 lakh passengers in 2015-16. The airport is expected to handle 14.87 lakh passengers by 2021-22.//

     

    vellu old news malli recycle chestara? otherwise we are in 2018-19 fiscal year... eppudo 2015-16 data ivvatam emiti? what happened to 16-17 and 17-18. ippudu vuuna trend continue ayithe Vij airport will reach 15L passengers by 2019-20. vellu emo 21-22 ani vesaru.

    I think this year itself it will be crossing 12 lacs. ( saw an article yesterday that said monthly number crossed 1 lac)

  6. 27 minutes ago, Jaitra said:

    They did for political reasons,why would Tata do it?Just to respect the sentiments of people?

    I would think so. Though main reason for Tata s, parsees in general to move out of Iran was religion (do not want to convert to muslim), they were purely business minded with good values of course. but later over the generations Tata s married in to Muslim, Christian and all sorts. It will be interesting to know whether he is religious person or not.

  7. 8 hours ago, sonykongara said:

    akkada govt land undha, tenders pilavakunda sankusthapana enti, leda navayuga valla ke isthara edi

    private port ayithe, vallaki istene legal issues vundavu. otherwise krishna patnam port exclusive zone rights kosam case veyyochhu vallu.

  8. 59 minutes ago, sonykongara said:

    5YB8AHN.jpg

    This article tries to justify why this bonds are needed instead of regular loans and the rate at which they were sold. In a way it is explaining there is no wrong doing/scam in this. I too agree that.

    TG took loans around 80000 cr (some of them at lower rate than AP) in the last 4 years. can it be credited as KCR success story?

     

  9. 11 minutes ago, sonykongara said:

    entha bari mottam e city kuda cheyyaledu ga bro, adi kuda kattaboye city

     ekkuva vaddi ki appu teesukovatam kuda goppena?

    by the way, it is nothing to with new/old/city. AP government is the guarantor. No matter who comes to power next in AP, this debt obligation must be honored.

  10. 1 minute ago, sonykongara said:
    27న అమరావతి బాండ్ల లిస్టింగ్‌
    23-08-2018 03:50:19
     
    • బీఎస్‌ఈలో ఘనంగా నిర్వహణకు ఏర్పాట్లు
    • పాల్గొననున్న సీఎం చంద్రబాబు, మంత్రులు
    అమరావతి, ఆగస్టు 22(ఆంధ్రజ్యోతి): అమరావతి బాండ్ల కు అపూర్వ స్పందన లభించిన నేపథ్యంలో ఈ నెల 27న తలపెట్టిన లిస్టింగ్‌ ప్రక్రియను కోలాహలంగా నిర్వహించేందుకు ఏపీసీఆర్డీయే విస్తృత సన్నాహాలు చేస్తోంది. బోంబే స్టాక్‌ ఎక్స్ఛేంజ్‌(బీఎ్‌సఈ)లో సోమవారం జరిగే కార్యక్రమంలో సీఎం చంద్రబాబు పాల్గొంటున్నారు. అమరావతి బాండ్ల లిస్టింగ్‌ సందడిగా జరగనుంది. ఈ బాండ్లు స్టాక్‌ ఎక్స్ఛేంజ్‌లో అధికారికంగా ట్రేడింగ్‌లోకి రావడంతోపాటు.. వీటిని కొనుగోలు చేసిన సంస్థలకు.. విక్రయించుకొనే వీలు కల్పించడాన్నే లిస్టింగ్‌ అంటారు. ఆర్బీఐ సహా పేరొందిన వివిధ మ్యూచువల్‌ ఫండ్‌ కంపెనీలు, బ్యాంకులు, ఆర్థిక సంస్థల ప్రతినిధులతోపాటు పెట్టుబడిదారులు కూడా హాజరుకానున్నారు. కొద్ది రోజులుగా వీరందరికీ ఆహ్వానాలు పంపించడంతోపాటు అమరావతి నుంచి ముంబై వెళ్లే వారికి అవసరమైన సౌకర్యాల కల్పనలో సీఆర్డీయే నిమగ్నమై ఉంది.
     
    విజయానికి గుర్తుగా..!: దేశంలోని అన్ని స్థానిక సంస్థలూ కలిపి ఇన్నేళ్లలో విడుదల చేసిన బాండ్ల విక్రయం ద్వారా సమకూరనంత అధిక మొత్తాన్ని ఒక్క అమరావతి బాండ్లు పొందిన సంగతి తెలిసిందే. రూ.1,300 కోట్ల విలువైన ఈ బాండ్లకు జారీ చేసిన గంటలోనే అనూహ్య స్పందన లభించింది. ఒకటిన్నర రెట్లు ఓవర్‌ సబ్‌స్ర్కైబ్‌ అయ్యి రూ.2,000 కోట్లు సమకూరిన విషయం విదితమే. ఈ పరిణామంతో జాతీయ మదుపరుల్లో అమరావతి, సీఎం చంద్రబాబు పట్ల ఎంత నమ్మకం ఉన్నదీ నిర్ధారణ అయ్యింది. స్టాక్‌ మార్కెట్‌ ద్వారా రాజధాని కోసం మరిన్ని నిధులు సమకూర్చుకునేందుకు వీలుగా అంతర్జాతీయ ఇన్వెస్టర్ల కోసం లండన్‌ స్టాక్‌ ఎక్స్ఛేంజ్‌లో మరికొద్ది నెలల్లో మసాలా బాండ్లు, అనంతర కాలంలో సాధారణ ప్రజలూ అమరావతి నిర్మాణంలో పాల్గొనేలా రూ.100 ముఖ విలువ కలిగిన బాండ్లను జారీ చేయాలని సీఆర్డీయే యోచిస్తోంది. అందుకే 27నాటి లిస్టింగ్‌ ప్రక్రియను ఘనంగా నిర్వహించాలని చూస్తోంది.

    indulo AP government success emundi. OA kakapothe.

  11. 2 minutes ago, AnnaGaru said:

    munner+other local flood left to sea is 15-20+ tmc and that is key....when phase-1 complete they run pattiseema non-stop...right now it is stopped 15-20 days in the middle

    also addtional flow avilable with chintalapudi lift....and right poalvaram discharge to eluru  canal is done at upper point and works almost complete...

    even after considering eluru canal diversion+chintalapudi, there is no more than 3-4k available at barrage for this lift. 

    So, 3k for 100 days + extra 4k for 30 days(munneru) is 35 TMC 

  12. 9 minutes ago, AnnaGaru said:

    phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

    we don't need bollapalli for this......phase-1 will complete in 2019...

     

    already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

    phase 1 lo 50 TMC not possible. 

    that is 7k cusecs for 83 days continuously.

  13. 7 minutes ago, sonykongara said:

    ninna cbn annadu అవుట్రింగ్ రోడ్డు, గ్రీన్ ఫీల్డ్ ఎయిర్ పోర్టు కృష్ణానది ప్రకృతి అందాలతో మరింత శోభను సంతరించుకోనుందన్నారు. నూతన సంస్కృతికి శ్రీకారం చుడతామని, ఎక్కువ మంది ప్రజలను ఆకర్షించే పర్యాటక కేంద్రంగా తీర్చిదిద్దతామన్నారు.  inko airport plan undi

    mangalagiri daggara vaste baagunnu (as per CRDA layout). kani ippudunna paristitullo unlikely to happen any time soon.

×
×
  • Create New...