Jump to content

swarnandhra

Members
  • Posts

    6,498
  • Joined

  • Last visited

  • Days Won

    10

Posts posted by swarnandhra

  1. Brother meeru cheppina 2 and nenu cheppina vatki pakasam barriage nunche water......sagar nunchi prattipadu side area ke...

    correct brother. Mangalagiri, Ponnuru, tenali, repalle vemuru are under Prkasam Barrage. Tadikonda lo metta ekkuva. no direct canal linkage. Jareebu vaatiki krishna nunchi lift chestaru migatavi motors anukunta.

     

    Prathipadu lo kuda Kakumanu mandal delta kindake vastundi. Intaku mundi idi Ponnur kinda vundedi. 

  2. It hub ani teskoni manufacturing hardware industries ani pettukotam entha varaku legal ga crct o naku idea ledu mari. 

    anyways lets hope for best bro

    IT hub "ki" ani teesukovatam ledu brother. aa land lo vacche one of the projects is IT hub.  above article also mentioned it is for IT, Tourism and other uses. electronic manufacturing is not as bad as other manufacturing industries, in fact, some of them are much cleaner than our software technology parks. e.g. foxconn ..etc. projects in these lands will be green and clean type. No pharmaceutical or petrochemical type industries.  By the way these lands are not contiguous. So, it is unlikely 1000s of acres will be given to a single industry. 

  3. red sandel kuda manchide bro.

    Sonybrother, My guess is these proposed forest lands has no farming potential that is the reason they are still under govt control - not occupied by farmers/binamis. In that kind of lands even trees can not survive without some body taking care of them. 

    Red Sandal is grown for wood and grows slowly.  that can not be cut. So farmers has no incentive to grow. poni farmers cut chesukovataniki ki exemption iddamanukunna it defeats the purpose of growing greenery.

  4. ee new forest land lo greenery penchali ante, better allow small farmers to grow native fruit trees like Mamidi, chinta, neredu .etc  (non-dwarf varieties with long life span) in those lands. They don't own the land but they can take the harvest. Govt. should provide funding for drip irrigation equipment and plant saplings. This way wild life may not be restored but at least greenery will be restored. 

  5. malli 33k acres a .. em cheskontam intha land .. IT ki antha akkarledu

    aa land lo IT hub vastundi annaru kaani 33k acres IT hub ki analeduga. okkokka university 200-400 acres adugutundi. inka central institutes ravalsinavi chala vunnayi. elctronics hardware manufacturing ...etc companies ni teesuku ravataniki try chestunnaru. Need land. idi teesukonaka pothe private lands teesukovalsi vastundi.

     

    Howerver, new forest ni matram edo name sake ki kakunda, sincere ga grow try cheayyali with water allocation.

  6. Hundreds of years nunchi waiting.....

    antha ledu le brother. we are growing 2 crops ever since Prakasam barrage was built. For krishna delta these problems are from last 10-15 years only due to new projects in Karnataka.

  7. కుడికాల్వకు నీటి నిలిపివేత 
    11-07-2016 02:03:14
    636037993929692967.jpg
    గోపాలపురం, జూలై 10: పట్టిసీమ ఎత్తిపోతల పథకం నుంచి గోదావరి జలాలను కృష్ణా నదికి అనుసంధానం చేసే ప్రక్రియలో తాత్కాలిక అవరోధం ఏర్పడింది. కుడి కాల్వనుంచి గోదావరి జలాలను గుడ్డుగూడెం 14.80వ కిలో మీటర్‌ వద్ద ఆదివారం ఉదయం అధికారులు నిలిపివేశారు. కాల్వ దిగువభాగంలో గుడ్డుగూడెం సమీపంలోని రెగ్యులేటర్‌ వద్ద గేట్లను మూసివేసి నీటిని నిల్వ చేశారు. శనివారం 1500 క్యూసెక్కుల నీటిని ఈ కాల్వ ద్వారా వి డుదల చేయడంతో అక్కడక్కడ గట్టు కోతకు గురైంది. 16వ కిలోమీటర్‌ వద్ద గట్టు బలహీన పడుతుందేమోనని ముందస్తు చర్యల్లో భాగంగా ఇసుక బస్తాలతో గట్టును పటిష్టం చేసేందుకు చర్యలు చేపడుతున్నారు. వేళ్లచింతలగూడెం, పెద్దాపురం సమీపంలో నిర్మించిన తాత్కాలిక వంతెనల వద్ద బారీకేడ్ల్లు ఏర్పాటు చేస్తున్నారు.
  8. 300 Km bullet trains kante 200km semi-high speed trains better. that extra 100km speed comes at a very high cost. 200km speed ki existing infra saripotundi. Need some enhancements(managable). not that costly. 200km speed maintain cheste amaravati to vizag and chennai are with in 2 hour journey.

  9.  

     petrochemical complex valla taxes+investments will increase in future okati start ayithe bunch of investments vastayi

     

     

    see this

    http://timesofindia....ow/22877666.cms

     

    Through Rajasthan petro chemical project 14000 crores revenue coming .

    State petroleum secretary Sudhansh Pant said that the production from Barmer has brought in revenue of Rs 14,000 crore (till August 31, 2013). "Oil wells in Barmer are ready to produce approximately 3 lakh barrels oil per day. This will significantly increase revenue for the state," he added.

     

    Ilanti plants 10 plants unte south india motham supply cheyochu petro products and each plant can make taxes of minimum 1000crores taxes to 30,000 crores/year to AP govt. We must concentrate on this can boost AP economy in less time and make AP debt free

     

    Petro Chemical and products corridor tho 3 years lo ready chesthe oka refinery i can say from 1st year motham AP deni nunchi supply isthe minimum 1000+ crores and slowly it may get increased into 10,000 - 20,000 -.... increase avutundi tax revenues in less then 10 years it will hit the peaks in taxes

     

    Even we take loans too no problem from 3rd year we can make repayment in 10 years and then we will move to profits in this sector. 1st start avadame kastam but once started it will be gold mine of india

     

    Yes, deeni valla state ki revenue perutugundi. Modi recent ga clear chesina (Eenadu article) 53000 cr offshore drilling project valla manaki emi use vundadu leaks and accidents tappa.

  10. not all the water not require same time kada... i am working on mechanical side.. water distribution anta idea ledu....

    We desparately need water brother. At least one week full capacity discharge is needed on both sides. That means pattiseema has to work at full capacity for two weeks continuously. (highly unlikely)

  11. water ee time lo enta avasaramo ante lift chestaru... ekkuva chesina storage big deal

    ekkuva enti brother, krishna delta east and west canal discharge capacity is 9400 and 6400 cusecs respectively. That means full pattiseema capacity can fill only half of the delta canal capacity. You work at the barrage right?

  12. 3-4 days continous ga run cheste thats sufficient... barraige daggara store cheyyagalagali kada........

    storage won't be a problem any time soon. There is need for all these 8500 cusecs discharge at barrage. East and West delta canals. 

  13. MAKU DUTIES ICHHARU... IPPUDE CALL VACHHINDI... MOTTAM ENNI DAYS LIFT CHESTARU...

    Flood vundali kada brother. 100 days is the estimate. 10 days passed already. So, another 90-100 days if all goes well. this may not be contiguous.

  14. :super:

    maa prakasam and ongole kuda develop avuthayi fast ga....

    It needs a straight connecting road brother. Currently it is around 100km. Straight road will cut it to 60km (commute distance) and helps expand Ongole. Otherwise Vinukonda might grab some of the action.

  15. thammileru lo ki neeru ravatam corecte kani, aa water prakasam barrage ki ravatam enti. It flows through Eluru right? Pattiseema late avvataaniki main reason Thammileru aqueduct ready avvakapovatam kada. Thammileru flows under polavaram canal. aa water polavaram canal lo kalapatam enti brother. could you please explain? will there be another lift at thammileru?

×
×
  • Create New...