Jump to content

ravikia

Members
  • Posts

    4,464
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by ravikia

  1. Just now, Yaswanth526 said:

     

    Kadupu tarukkipothundhi ee video chusi, aa Chetha na dash gallu anna maatalu gurthochi, We terribly failed to project the development happened in Amaravati and failed to counter the graphics arguments 

  2. 2 hours ago, G Venkatesh said:

    Polavaram live streaming links kuda eyyandi

    Aa madhya annaru istham ani, nenanithe ekkada chudala ichinatlu. Ap fibregrid through istham annaru. Aa site lo kooda levu links emi.

  3. 3 hours ago, sonykongara said:
    4 114/PROC/ CRDA- 13022(32)/1/2019-AP2-TT-APCRDA 02/03/2019 29/03/2019 RFP for Selection of Consultants for Preparation of Techno Economic Feasibility Study and Detailed Project Report (DPR) for a) Bridge on river Krishna connecting N13 road in Amaravati and National Highway (NH) 65. b) New Bridge on River Krishna connecting NH 65 and old GT Road on downstream of Prakasam barrage. c) Road Bridge connecting E13 road in Amaravati and National Highway (NH) 16.

    Thanks bro. I had a thorough look on the same day and got the understanding. By reading through this DPR tender it is clear they are planning 4 bridges on Krishna within the range of 17kms. 

    1. N6 road(Tallaya palem) connecting Surayapalem( Part of Vijaywada proposed bypass-Dropped from Gammon india and still part of package 1&2 of the gundugolanu exention project) - Proposed in this DPR as well, but road connecting on other side of varadhi at existing Tadigadapa 100feet road.

    2. N10 (Udhandarayuni palem) connecting Pavithra sangamam (Ibrahim patnam). Project work started by L&T.

    3. The proposal bridge in this DPR connecting N13(Rayapudi) with mulapadu.

    4. Another bridge part of Inner ring road (mostly road bridge on Vykuntapuram barrage) connecting Vykuntapuram with kethanakonda. Not part of this DPR tender.

    So 4 bridges within the range of 17-20 kms. And this is except Outer ring road.

    Not sure if these many required ?. They could drop the one proposed at N13(rayapudi), since the inner ring bridge is just 4-5kms away from this N13.

    I hope they start Inner ring works as well, since the alignment and everything is done.

  4. 16 minutes ago, sonykongara said:

    Tenders lo ledhu DPR ki. May be they will update later. I looked at the road network now and got better understanding. My only thing was if the down stream bridge connecting Bandar road and NH-16 is part of Inner or not. It looks like it is not. But as per Inner ring alignment this proposed bridge is being located(max 8-10km distance) close to Inner ring bridge as well(Probably road cum barrage at Chodavaram).

    Let us see.

  5. 21 minutes ago, Raaz@NBK said:

    Yeah 2 iconic bridges

    Venkatapalem daggaradhi 6 lane bridge

    Avnu L&T vadu chesedhi Pavitra Sangam dagaradhi..

    Vijayawada ORR ee patiki ayipoyi vunte asala intha traffic vundedhi kadhu Durgamma temple and Benz Circle dagara.. 

    Adega. Eee kindha google map chudandi. ORR land alignment clear ga vundhi(From gollapudi to BB.Gudem). Land acquired and paid and alignment marked clearly.

    Aina kooda baffas ki road veyadaniki manasu ravatla. Worst fellows. Land isthe kooda road veyaleni adhogasthapu govt baffas thappa evaru vundaru.

    ORR-Land-Acquisition-alignment-google-map-4.thumb.jpg.18cc793b145cfe8197369f14d9edf166.jpg

  6. 6 minutes ago, Raaz@NBK said:

    Idhi Gollapudi - Venkatapalem bridge bro.. Gaman India vadi ki sanction ayindhi oka plan..Ippudu aa area capital ayindhi kabatti.. Gaman India vadu handsup anesariki kothaga tenders pilichindhi.. Ee bridge plan marcharu.. kotthaga vundetattu chesthunnaru..

    Idhi Vijayawada ki ORR 

    First Iconic Bridge plan Pavitra Sangam ki.. Ippudu gollapudi-venkatapalem bridge ki kuda iconic bridge plan include chesaru ani rasadu article lo

    Ok got it. So two Iconic bridges annamaata. This gives lot of clarity. Thank you.

    Endhukante Sangamam daggaridhi L&T vadiki icharu and works November lo start antunnaru and it is connected to N10, I think.

    Eee ORR kanna mundhu IRR aipodhemo complete ?

  7. 7 minutes ago, sonykongara said:
    Tuesday, 12 Jun 2018
    Share this on :
     

    The construction arm of Larsen & Toubro (L&T) will build an iconic bridge across the river Krishna at Amaravati in Andhra Pradesh.

    The scope of work envisages design and construction of a 3.2 km, six-lane iconic bridge across the river Krishna, which includes 2.72 km of approach bridges, on EPC basis.

    The bridge will connect Pavitrasangamam in Vijayawada and NIO Road in Amaravati. The value of the project is Rs 1,387 crore. The tender was floated by the Amaravati Development Corporation (ADCL) and has also been entrusted with the operation and maintenance for the bridge for five years.

    Mari ee outer ring project lo Iconic bridge include chesaru ani raasaru ga bro.

     "మరో ప్యాకేజీలో కృష్ణానదిపై ఐకానిక్‌ వంతెన నిర్మాణం. దీన్ని ఇప్పటికే సీఆర్‌డీఏ ఆధ్వర్యంలో పలు ఆకృతులు తయారు చేశారు. దీని నిర్మాణంపై ప్రతిష్టంభన ఉంది. ఎన్‌హెచ్‌ఏఐ చేపడుతుందా.. లేక సీఆర్‌డీఏ చేపడుతుందా అనేది ప్రశ్నార్థకమే. ఎన్‌హెచ్‌ఏఐ మాత్రండీపీఆర్‌ తయారు చేయాలని టెండర్లను ఆహ్వానించడం విశేషం. ప్రస్తుతం ప్రాంతీయ కార్యాలయంలో టెండర్లను తెరవాల్సి ఉంది. దీనిపై ఇంకా నిర్ణయం తీసుకోలేదని అధికారులు చెబుతున్నారు. వడపోతలో ఏడు సంస్థలు నిలిచాయని పీడీ విద్యాసాగర్‌ చెబుతున్నారు. దాదాపు అయిదు నెలలు గడిచినా దీనిపై ప్రాంతీయ కార్యాలయంలో ఎలాంటి నిర్ణయం తీసుకోలేదు"

    From above article.

  8. Outer ring antaaru, malli deentlo Iconic antaaru. Uff very confused.

    The bridge on Krishna as part of Outer ring was proposed between Venkata palem-Gollapudi annaru. Ippudu Iconic location Rayapudi/Udhandarayuni palem - Pavithra sangamam maarcharu.

    Outer ring land acquisition all completed kada, malli ippudu Iconic location maaristhe malli land acquire chesthaara ?

    This Outer will never happen, until Modi & co goes next year.

  9. 2 minutes ago, Yaswanth526 said:

    Meeru Washington DC vachunte you have clear idea of this one

    Idi simple copy and paste of US capitol

    House of representatives old and new buidlings and supporting rooms (Manaki Assembly and Mandali)

    Statues of Persons who fought for their country and history of their country

    Its also a Tourist spot free of cost

    Kaneesam ee Assembly ki aina jenam visit cheyatanikisthe bavunnu. Aaa madhya Velagapudi Assembly ki kaneesam Gate lopaliki(Not during session) kooda vellanivvaledhu. Eee building dooram nundi chusi anandhinchadamenemo manaki.

  10. 10 minutes ago, sonykongara said:

    court  dwarga gattiga try chesthe saripothundi

    Kastam bro ippudu. Court ichina adi implement cheyalsindhi Govt e kada. Problem is with PK instigating the farmers with his casette group and CBN doesn't want anything instigating now. 

  11. On 11/20/2018 at 6:37 AM, sonykongara said:

    JU42G29.jpg

     

    16 minutes ago, Hello26 said:

    Veellem manushulu swami. Ila ayithe Seed Access Road complete avudda before elections? 

    This will be the major hurdle for Accessing Amaravati. There is no direct non-stop route to Any part of the capital now.

    Seed access will be connected to NH-5 only after 2019 general elections. Babu garu doesn't want to touch Vundavall-Penumaka P**ta batch close to Election time. Unless these villages farmers see the development in Amaravati and convince themselves, there is no way this happens before 2019. Babu garu ee villages names ethithe chalu PK gaadu egesukuntu vachesthunnadu, vullipai gaadu.

  12. 17 hours ago, sonykongara said:

    lite adi

    Picha na pushpalla vunnaru ga ee World bank vallu kooda. Ee sodhantha lekunda babu garu aa local bonds and NRI bonds evo release chesthe oka 7-8% interest tho, evadu appudu ivvakkaraledhu.

×
×
  • Create New...