In new power projects- this is the status after taking so many loans & with huge dues.

Installed capacity:
2014 2022
TS 7700 MW 18500 MW
AP 9500 MW 20500 MW

Both the richest state TS & not so rich AP added approx the same 11500 MW.
4/n

— Konda Vishweshwar Reddy (Modi Ka Parivar) (@KVishReddy) December 8, 2023