During the last week, 3.02 lakh cubic metres of excavation was done and 28,000 cubic metres of concrete was laid regarding Spill Channel, Approach Channel and Left Flank #Polavaram #APwithCBN #APwithTDP

— Telugu Desam Party (@JaiTDP) June 18, 2018