37 minutes ago, Jeevgorantla said:

No Offence brother, I am not here to prove that you are wrong. Seems like there is mismatch in data. 

http://iwm.vassarlabs.com/waterbalance/sensor%3Fsource=reservoir&component=Reservoirs&&state=ANDHRA PRADESH&reservoir=YELERU RESERVOIR

I immensely respect Your contribution to DB.

ala emi brother, eenadu lo ela vesadu ani antunnna brother,tappu ayithe delete chestha dani lo emi undi. nenu ippude chusanu

 

Edited by sonykongara
Link to comment
Share on other sites

1 hour ago, Jeevgorantla said:

No Offence brother, I am not here to prove that you are wrong. Seems like there is mismatch in data. 

http://iwm.vassarlabs.com/waterbalance/sensor%3Fsource=reservoir&component=Reservoirs&&state=ANDHRA PRADESH&reservoir=YELERU RESERVOIR

I immensely respect Your contribution to DB.

yes bro,eenadu news ki, cm core dashboard news ki  chala teda undi tappu vesadu ankunta eenadu lo

Link to comment
Share on other sites

14 hours ago, Jeevgorantla said:

No Offence brother, I am not here to prove that you are wrong. Seems like there is mismatch in data. 

http://iwm.vassarlabs.com/waterbalance/sensor%3Fsource=reservoir&component=Reservoirs&&state=ANDHRA PRADESH&reservoir=YELERU RESERVOIR

I immensely respect Your contribution to DB.

CM Dashboard lo 'Yeleru' reservoir lo 14.53 TMC water present storage vundi, idi mostly updated every 1Hr.

Link to comment
Share on other sites

  • 5 months later...
రేపు ఏలేరుకు గోదావరి జలాలు
04-07-2018 03:59:56
 
636662735970582929.jpg
  • నీటి విడుదలకు ముహూర్తం ఖరారు
  • విజయవంతంగా ఫేజ్‌-2 ట్రయల్‌రన్‌
  • ఏలేరు రైతాంగం హర్షం
 
సీతానగరం/జగ్గంపేట, జూలై 3: గోదావరి జలాలు ఏలేరుకు అందించడానికి ముహూర్తం ఖరారైంది. ఈ నెల 5న తూర్పుగోదావరి జిల్లా సీతానగరం మండలం పురుషోత్తపట్నం ఎత్తిపోతల పథకం ద్వారా నీటిని వదలనున్నట్లు డీఈ వెంకట్రావు తెలిపారు. కాగా, మంగళవారం పురుషోత్తపట్నం ఫేజ్‌-2 ట్రయల్‌రన్‌ను మంగళవారం విజయవంతంగా నిర్వహించారు. మోటార్ల పనితీరుపై అధికారులు సంతృప్తి వ్యక్తంచేశారు. తూర్పుగోదావరి జిల్లా జగ్గంపేట మండలం రామవరం గ్రామంలోని పోలవరం ఎడమ కాలువ పక్కన ఫేజ్‌-2 మోటార్లను ఏర్పాటు చేశారు. పురుషోత్తపట్నం నుంచి గోదావరి జలాలు పోలవరం ఎడమ కాలువ ద్వారా ఫేజ్‌-2కు చేరుతాయి. ఈ నీటిని 8 మెగా మోటార్లు ద్వారా (ఒక్కో మోటారు పరిమాణం 175 క్యూసెక్కులు) 1400 క్యూసెక్కుల నీటిని 20 అడుగుల వెడల్పు గల రెండు పైపుల ద్వారా ఏలేరుకు తరలిస్తారు. ఇందులో భాగంగానే డీఈ రామ్‌కుమార్‌ పర్యవేక్షణలో ట్రయల్‌రన్‌ నిర్వహించారు.
Link to comment
Share on other sites

PLIS to start pumping water into Yeleru

VISAKHAPATNAM: The stage is set for the pumping of water from river Godavari to the Yeleru reservoir through the Purushothapatnam lift irrigation scheme (PLIS) on Thursday. As part of the project, water from the Godavari would be diverted to Polavaram left main canal (LMC) and thereafter into the Yeleru reservoir. It is learnt that the pumping will start with about 1,400-1,500 cusecs on Thursday from Purushothapatnam.

https://timesofindia.indiatimes.com/img/64861955/Master.jpg

A lion’s share of water for Vizag city is drawn from the Yeleru reservoir. However, the reservoir has not reached its full level in recent years. The Greater Visakhapatnam Municipal Corporation (GVMC) was thus compelled to pump water from the Yeleru reservoir into the Yeleru canal once the water levels in the reservoir dipped below the 71.5-metre range or when the reservoir is determined to have only dead storage during the summer months.

Otherwise, the water flows by gravity into the Yeleru canal and thereby to Vizag. Due to the reduced water supply from Yeleru during the summer months, the duration of water supply to the households is decreased and several industries are forced to operate at reduced capacity.

According to a GVMC official, the water from PLIS will flow by gravity along 50.2 km of the project. “From there, the water will be pumped through two pipelines. The pumping is expected to start with 1,400-1,500 cusecs at Purushothapatnam based on the availability of water in the Godavari. About 700 cusecs will be pumped into Yeleru reservoir while the other 700 cusecs will be used for other purposes. It may take two to three days before the water reaches the pumping station after flowing 50.2 km by gravity,” he said.

According to the official, over a period of time, this will do away with the need of pumping water from the Yeleru reservoir from dead storage as the water levels will be always maintained above the dead storage with continuous water supply into the reservoir through PLIS. Once things settle down, 30 TMC of water will be drawn from PLIS for various purposes, including 10 TMC for the Yeleru reservoir. The water level in the Yeleru reservoir was 70.5 metres as of Wednesday. Once the level goes above 71.5 metres, the officials will stop the pumping from the reservoir, the GVMC official added.

Link to comment
Share on other sites

పురుషోత్తపట్నం’ పంపులకు స్విచ్‌ ఆన్‌
06-07-2018 02:53:10
 
636664423913201461.jpg
  • 5 పంపుల నుంచి నీటి విడుదల
  • ట్రయల్‌ రన్‌.. తర్వాత ప్రభుత్వానికి నివేదిక
సీతానగరం, జూలై 5: ఏలేరు ఆయకట్టుకు నీరందించడం, ఏలేరు రిజర్వాయరు ద్వారా విశాఖ పారిశ్రామిక, తాగునీటి అవసరాలను తీర్చేందుకు నిర్మించిన పురుషోత్తపట్నం ఎత్తిపోతల పథకం పంపులను గురువారం ఎస్‌ఈ శ్రీనివాస్‌యాదవ్‌ స్విచ్‌ ఆన్‌ చేసి ప్రారంభించారు. ఈ సందర్భంగా ఆయన మాట్లాడుతూ.. ఫేజ్‌-2 వద్ద గ్యాస్‌ పైప్‌లైన్‌ క్రాసింగ్‌ సమస్య వల్ల పనులు ఆలస్యమయ్యాయని, పాత పైప్‌లైన్‌ తొలగించడంతో అడ్డంకులు తొలగిపోయాయని చెప్పారు. ఫేజ్‌-1 పురుషోత్తపట్నం వద్ద అన్ని పంపుల మోటార్లు పూర్తిస్థాయిలో సిద్ధమయ్యాయన్నారు.
 
ప్రస్తుతం ఒక్కొక్క పంపు 350 కూసెక్కుల సామర్థ్యంతో 10 పంపులు, మోటార్లు సిద్ధంగా ఉన్నాయన్నారు. గోదావరి నీటిమట్టం 14.56 అడుగులు ఉన్నందున నీటి విడుదలకు కూడా ఇబ్బందిలేదన్నారు. ప్రస్తుతం ఇది ట్రయల్‌ రన్‌ మాత్రమేనని తెలిపారు. ఫేజ్‌-2లో 8 పంపులు సిద్ధంగా ఉన్నాయన్నారు. ఇప్పుడు వదిలిన నీరు 8.6 కిలోమీటర్ల వరకు పైప్‌లైన్‌ ద్వారా వెళ్లి పోలవరం కాలువలో కలుస్తుందని, సుమారు 62 గంటలలో ఫేజ్‌-2 పంపుల వద్దకు చేరుకుంటుందని తెలిపారు. అక్కడ ఫేజ్‌-2 పంపుల సామర్థ్యాన్ని పరిశీలించి పూర్తి స్థాయిలో రెండు ఫేజ్‌లు సిద్ధమయ్యాక ప్రభుత్వానికి తెలియజేస్తామన్నారు.
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...