Jump to content

JICA stops(hold) funding for bulle train


AnnaGaru

Recommended Posts

Modi used all his powers to get this loan approved just within 3 months

 

-onething MODI has done is with NITI gave letter that India will use LOW INTEREST JICA total amount for bullet train.....with that clause all states lost "low interest" loans avilability

- by the way interest rate increased multiple times with dollar change :wall:

 

Total cost now will touch 2 lakh crore?

 

http://www.newindianexpress.com/business/2018/sep/22/centre-forms-panel-after-jica-stops-funds-for-bullet-train-1875441.html

Link to comment
Share on other sites

19 minutes ago, swarnandhra said:

aruvu thecchukunna technology (too expensive) tho intha pedda project viable kadu. major routes ni at least 150-200km speed ki upgrade chesukunnaka tarvaatha ilanti project start cheste baaguntundi.

idi oka vanity project. deeniki pette karchu dedicated freight corridor ki pedithe chaalaa use vuntundhi. 

Link to comment
Share on other sites

north vallatho idi expensive ante, pavala vaddi ye kada annaru

mari operating expenses kuda alane vuntayi - tarvathe adi center ki burden ye kada ante - no response

dani badulu current infra ni develop cheyyotchu kada ante - matladaru

Secundrebad station ni choosa - malli top rating antaru - yenduku le

 

Link to comment
Share on other sites

i went to vijayawada loco shed in my diploma excursion.  we got inside rail engine. driver showed us how to run train. train don't have steering. train maximum speed depends on track . if the track contain sharp curves then train has to run slowly. if the track is  straight line or with curves with less degree train can run with high speeds. by changing alignments at certain places of track to reduce curves they can run trains upto 160  kmph which is enough for any indians. 

Link to comment
Share on other sites

10 minutes ago, rk09 said:

north vallatho idi expensive ante, pavala vaddi ye kada annaru

mari operating expenses kuda alane vuntayi - tarvathe adi center ki burden ye kada ante - no response

dani badulu current infra ni develop cheyyotchu kada ante - matladaru

Sec. station ni choosa - malli top rating antari - yenduku le

 

modi bhakths says if  we bring back looted money of congress we can build many bullet train  tracks. we can' argue with them. they are suffering from modi addiction .

Link to comment
Share on other sites

3 minutes ago, ravindras said:

modi bhakths says if  we bring back looted money of congress we can build many bullet train  tracks. we can' argue with them. they are suffering from modi addiction .

I have seen many of stopped supporting him. Only few in-secure people blindly supporting. 

Epically this petrol and desile hikes. 

Though he is not culprit for above things but people are suffering 

Link to comment
Share on other sites

last month India trip lo Ap employees train ekka

- 4 hours lo Guntur reached - Nonstop from Secundrabad to Guntur

- less than 5 hours to VJA - Train full (3 AC chair cars - all are full). We even checked the speed at several times. Top it was 90 mph (145kmph)

India lo less than 300 km vunna cities existing road and rail connectivity bagu chesthe chalu anipinchindhi. Local economy kuda bagupaduthundi

 

 

 

Link to comment
Share on other sites

Ex: Karakatta (Vijayawada - Avinagadda) road open chesina taruvatha lot of people relocated to their villages and travelling daily from their villages to Vijayawada

especially some Govt. employees. its win-win 

valla argument enti ante - Hyd lo vunnappudu ganta pattedi ippudu ante - but no need to pay rent and some groceries

btw - VJA lo rents matram too much le

 

Link to comment
Share on other sites

15 minutes ago, ravindras said:

i went to vijayawada loco shed in my diploma excursion.  we got inside rail engine. driver showed us how to run train. train don't have steering. train maximum speed depends on track . if the track contain sharp curves then train has to run slowly. if the track is  straight line or with curves with less degree train can run with high speeds. by changing alignments at certain places of track to reduce curves they can run trains upto 160  kmph which is enough for any indians. 

true, oka curve kosam, 5 minutes mundu nunchi slow avvatam, malli 5 minutes accelerate avvatam thone saripotundi. straighten/strengthen chesi, chinna stations lo kuda extra/loop lines add cheste baaguntundi.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...