Jump to content

Live updates: TV5 - Flash team survey


nvkrishna

Recommended Posts

  • Replies 221
  • Created
  • Last Reply

Wl be tough 4 kcr... may scrape through with MIM support. ..South TG lo of -ve... 

If oppn can successfully project him as pro bjp they can win Muslim favor..

Hyd : I guess people esp settlers n north people realised mistake made in ghmc..

If cong n tdp sincerely work together they can win 60...

Link to comment
Share on other sites

Why people dont like cong reason ....

cong satta enti ante ......

KPHB - Hitech city  flyover .... aksharala 8 years kattaru.....  paiga design failure ....... lingampally ki handsup last ki .....

KCR multilayer flyover annadu cyberabad lo almost 5 kadutunnadu about to end ......

so janalu evanni chuse ..... middle class to upper class ... board tippesaru .....

sorry i am not supporter of TRS but want to let you know the reality ani trying ...

Link to comment
Share on other sites

3 minutes ago, sonykongara said:

tdp poti chesthundi fight chesevallu chestharu,istam leni silent ga untaru andukani munde baypadtam enduku,BJP ki enni votes unnayi AP lo fight cheyytala, poti cheyyatala

Bayapadatam emundhi bro.. fight cheyyadame.. mahakutami tho change avochu.. ipati nunchii Kcr graph padipovachu.. fight cheyyali vote bank penchukovadaniki ayina..

Link to comment
Share on other sites

2 minutes ago, Andhrudu said:

Why people dont like cong reason ....

cong satta enti ante ......

KPHB - Hitech city  flyover .... aksharala 8 years kattaru.....  paiga design failure ....... lingampally ki handsup last ki .....

KCR multilayer flyover annadu cyberabad lo almost 5 kadutunnadu about to end ......

so janalu evanni chuse ..... middle class to upper class ... board tippesaru .....

sorry i am not supporter of TRS but want to let you know the reality ani trying ...

Congress lo andaru herole..ikkada nalugure herolu..budget Antha vaalla line vuntadi.

Link to comment
Share on other sites

1 minute ago, Raaz@NBK said:

Lifting modhalu pedithe 15-20% ki vellina no surprise..

Yearly 20k for power.. 2020 ki reneval Chesthe inko 5k ekkuva.. total 25k crores 

water vishaya lo .... Telangana leaders mottam .... janalni pachiga darunamga mayamatalu tho mosam chestunnaru .......

facts cheppe dairyam evariki ledu ..... just mood cash cheskovadam ...... hatred category lo problems ni AP pai toseyatam

....godavari water mottam dobbestunanru ....

....TS vallu mottam kallu addam pedite agipotai water .... lasti pachi matalu cheppi mosam chestunanru 

TS anta plateaus  land ....okka river kuda leud ..... krishna godavari basement area kaniasam % kuda ledu ..... geographical ga disadvantage area okka leader kuda honest ga cheppatla

 

Link to comment
Share on other sites

1 minute ago, Andhrudu said:

water vishaya lo .... Telangana leaders mottam .... janalni pachiga darunamga mayamatalu tho mosam chestunnaru .......

facts cheppe dairyam evariki ledu ..... just mood cash cheskovadam ...... hatred category lo problems ni AP pai toseyatam

....godavari water mottam dobbestunanru ....

....TS vallu mottam kallu addam pedite agipotai water .... lasti pachi matalu cheppi mosam chestunanru 

TS anta plateaus  land ....okka river kuda leud ..... krishna godavari basement area kaniasam % kuda ledu ..... geographical ga disadvantage area okka leader kuda honest ga cheppatla

 

Repu dam kattaka kuda sufficent water lenapudu vuntadhi okokadiki :D

Link to comment
Share on other sites

tg need 12,000 mw power for all lift irrigation projects for both existing and under construction projects. i assumed 0% transmission and distribution losses.

ie for each hour they require 1.2 crore units(kwh).

assume each unit cost 5 rupees (actual value varies from 5.6 to 6.5 rupees)

for each hour they need to spend 6 crore as variable charges.

for 24 hours 6*24 = 144 crores ( per day)

some projects like kaleshwaram run for 150 to 180 days

some projects like palamuru rangareddy run for 100 to 120 days.

let us take conservative figure of 120 days

they need 120*144 = 17280 crores as variable charges

they have to pay fixed charges per each mw . i am not use how  much it will be . let us take conservative figure 3000 crore

total it comes to around 20,000 crore.

in future kcr want to increase kaleshwaram capacity. there are some stupid proposals  which require more power to lift godavari water to south telangana.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...