Jump to content

ap secretariat water leakage


ravindras

Recommended Posts

4 hours ago, Npower said:

Emo.. Kaani chaalaa embarrassing gaa vundi eee issue matram. Enduko tagina jaagrattalu kaanee.. Leakages expose ayinaa tarvaata choopinchaalsina seriousness kaanee ye matram teesukonatle kanabaduthondi. 

i totally agree...very embarrassing. 300 crores anukuntaa karchupettindi. Aa maatram naanyatha leni buildings ela kattukunnaru. Ante contractors migulchukunnarannamaata. 

Link to comment
Share on other sites

12 minutes ago, Vivaan said:

i totally agree...very embarrassing. 300 crores anukuntaa karchupettindi. Aa maatram naanyatha leni buildings ela kattukunnaru. Ante contractors migulchukunnarannamaata. 

Manake elanti alochanalu vasthunnai ante enka jaffas ki pandage

Link to comment
Share on other sites

1 hour ago, Vivaan said:

i totally agree...very embarrassing. 300 crores anukuntaa karchupettindi. Aa maatram naanyatha leni buildings ela kattukunnaru. Ante contractors migulchukunnarannamaata. 

1200cr bro AP temp secretariat meda total ga ...... ekkada myhome , aditya , smr , silpa  akariki ramky Hyderabad lo terrific ga kadutunnaru buildings .....

vellu edo gudiselu esinattu vesi unna paruvu tisaru L&T and shapoor .....

my home ki echi unte poyedi .... chala cheap aipotaru elantivi vatiki utta punyana

Link to comment
Share on other sites

31 minutes ago, swarnandhra said:

more than corruption, it is due to lack of workmanship/oversight/quality control. 3 years patte project ni 4 months lo cheyyataaniki try cheste ilage jarugutundi. It is just a blemish, not catastrophic. I hope these mistakes are not repeated in Polavaram.

yes this is the one of the reason. this one already happened in building aqueduct on polavaram rmc.

https://timesofindia.indiatimes.com/city/vijayawada/Pattiseema-Lift-Irrigation-Scheme-scheme-receives-a-blow/articleshow/49046414.cms

chintalapudi lift irrigation project contractor ni koodaa ilaage structures vishayamlo tondara pedutunnaaru. konni uncontrol things vuntaayi like weather(rains). varsham vachinaa pani cheste  concrete sarigga stabilize avvadu. deadlines reasonable gaa lekapothe chaalaa problems vastaayi.

punaadhi vesaaka curing cheyyaali. wall kattaaka  two weeks curing cheyyaali. 2 weeks curing chesaaka plastering chesukovachu. ilaa konni tappaka cheyyavalasina panulu vuntaayi. slab vesaaka curing cheyyaali. each and every stage of building require some time to stabilize . once it stabilize builder can go for next level.

cbn one month late gaa inaugurate chesinaa paravaledu. quality compromise avvakundaa vunte chaalu. 

Link to comment
Share on other sites

8 hours ago, swarnandhra said:

more than corruption, it is due to lack of workmanship/oversight/quality control. 3 years patte project ni 4 months lo cheyyataaniki try cheste ilage jarugutundi. It is just a blemish, not catastrophic. I hope these mistakes are not repeated in Polavaram.

They are India's no 1 builders... don't think they will spoil their name by involving in corruption. lack of workmanship is the problem anukunta bro.. as long as the roof is properly laid with slope to the edges, water shouldn't leak... or might be these builders gave sub-contract to some local builders and they might have screwed up the quality.

Link to comment
Share on other sites

11 hours ago, Andhrudu said:

1200cr bro AP temp secretariat meda total ga ...... ekkada myhome , aditya , smr , silpa  akariki ramky Hyderabad lo terrific ga kadutunnaru buildings .....

vellu edo gudiselu esinattu vesi unna paruvu tisaru L&T and shapoor .....

my home ki echi unte poyedi .... chala cheap aipotaru elantivi vatiki utta punyana

this is govt bro... prati okkadu exploit cheyyatanike try chestaru

Link to comment
Share on other sites

2 hours ago, katti said:

They are India's no 1 builders... don't think they will spoil their name by involving in corruption. lack of workmanship is the problem anukunta bro.. as long as the roof is properly laid with slope to the edges, water shouldn't leak... or might be these builders gave sub-contract to some local builders and they might have screwed up the quality.

my comment sounded like I meant they did corruption bro?

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...