13 minutes ago, sonykongara said:

godavari to krishna 250km vesadu ela edi

distance between polavaram to aqueduct on krishna river is 255km. distance between acqueduct  and bollapalle reservoir is (317-255) km. canal alignment is different to road alignment. canal distance will be less/more than road distance .

 

Link to comment
Share on other sites

16 minutes ago, RamaSiddhu J said:

Actually considering pattiseema completion in record time anything is possible if we have money

ysr completed earth work on canal between polavaram and prakasam barrage. otherwise it could take more time. there are no tunnels between polavaram and vijayawada.

at best cbn can complete in 10 years if he fulfill following conditions.

1. provide sufficient funding

2. works given to capable contractors like meil/navayuga

3. make sure no legal cases due to land acquisition and r&r 

Link to comment
Share on other sites

22 minutes ago, ravindras said:

 

@Raaz@NBK 

meeku cbn,lokesh meedha vunna confidence cbn,lokesh ke vundademo?

manaki  tdp, cbn, lokesh meedha entha affection vunnaa reality ni ardham chesukovaali. there will be practical constraints in implementing any project.

 

Nenu matladedhi Only upto bollapalli reservoir not Godavari-penna

Link to comment
Share on other sites

1 hour ago, mahesh1987 said:

next 5 years lo harichandrapuram-nakerikallu linking complete chesthe excellent gaa chesinattu bollapalli reservoir ippudu alla avvadu

Upto bollapalli reservoir Next tenure lo Pakka avtadhi bro..

Godavari - penna long term process 

:shakehands:

Link to comment
Share on other sites

Just now, Raaz@NBK said:

Nenu matladedhi Only upto bollapalli reservoir not Godavari-penna

tough part is between godavari and bollapalle as it includes canal,tunnels and aqueduct. easiest part is between bollapalle and somasila (except 1.7 km tunnel) mostly canal.

Link to comment
Share on other sites

47 minutes ago, ravindras said:

tough part is between godavari and bollapalle as it includes canal,tunnels and aqueduct. easiest part is between bollapalle and somasila (except 1.7 km tunnel) mostly canal.

vykuntapuram, lift works ki next month ne sankusthapana ave use chesukuntaru NSP canal  karempudi daka, inko 2 lift pedithe saripothundi

Link to comment
Share on other sites

phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

we don't need bollapalli for this......phase-1 will complete in 2019...

 

already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

Link to comment
Share on other sites

3 minutes ago, AnnaGaru said:

phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

we don't need bollapalli for this......phase-1 will complete in 2019...

 

already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

adi ok bro dani meda naku doubt ledu, phase-2 meda ne disco

Link to comment
Share on other sites

4 minutes ago, AnnaGaru said:

phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

we don't need bollapalli for this......phase-1 will complete in 2019...

 

already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

 

 

7 minutes ago, AnnaGaru said:

phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

we don't need bollapalli for this......phase-1 will complete in 2019...

 

already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

next month sankustapana

Link to comment
Share on other sites

11 minutes ago, sonykongara said:

adi ok bro dani meda naku doubt ledu, phase-2 meda ne disco

not at all worried for phase-2 and no urgency and it can wait(don't get me wrong but phase-1 itself gives 15+ lakhs acres life)

 

Other than MODI any other PM would support phase-2,3 with center help as it solves south 3 states problem...so better to finish phase-1 and show to india now "with gravity do you water to kaveri/penna or not"

 

phase-1 is like lift&use and no storage.....2,3 all gravity(zero life) and center should pitch-in

Link to comment
Share on other sites

9 minutes ago, AnnaGaru said:

phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60....

we don't need bollapalli for this......phase-1 will complete in 2019...

 

already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8%  extra

phase 1 lo 50 TMC not possible. 

that is 7k cusecs for 83 days continuously.

Link to comment
Share on other sites

3 minutes ago, swarnandhra said:

phase 1 lo 50 TMC not possible. 

that is 7k cusecs for 83 days continuously.

munner+other local flood left to sea is 15-20+ tmc and that is key....when phase-1 complete they run pattiseema non-stop...right now it is stopped 15-20 days in the middle

also addtional flow avilable with chintalapudi lift....and right poalvaram discharge to eluru  canal is done at upper point and works almost complete...

Link to comment
Share on other sites

2 minutes ago, AnnaGaru said:

munner+other local flood left to sea is 15-20+ tmc and that is key....when phase-1 complete they run pattiseema non-stop...right now it is stopped 15-20 days in the middle

also addtional flow avilable with chintalapudi lift....and right poalvaram discharge to eluru  canal is done at upper point and works almost complete...

even after considering eluru canal diversion+chintalapudi, there is no more than 3-4k available at barrage for this lift. 

So, 3k for 100 days + extra 4k for 30 days(munneru) is 35 TMC 

Link to comment
Share on other sites

1 hour ago, Dravidict said:

YSR died in 2009. This is the status of Polavaram till 2014. 35a0ku1.jpg

We need to include 2 more rows (Approvals and Land Acquisition issues) per each of 3 main works (RMC, LMC and Head Works). The status by the end of YSR rule was zero in those parameters.

Link to comment
Share on other sites

6 hours ago, Dravidict said:

YSR died in 2009. This is the status of Polavaram till 2014. 35a0ku1.jpg

5 hours ago, Hello26 said:

We need to include 2 more rows (Approvals and Land Acquisition issues) per each of 3 main works (RMC, LMC and Head Works). The status by the end of YSR rule was zero in those parameters.

some earthwork is pending due to land acquisition problems. jarigina canal earthwork anthaa ysr time lone. rosaiah,kiran kumar reddy time lo  emi work jaragaledu. migilina land acquisition cbn time lo complete ayyindi. earthwork complete ayyindi.

is it possible to acquire land and complete entire canal of the length more than 175 km within 1 to 2 years? think practically.

ysr time lo headworks jaragaledu. canal earth works jarigaayi

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...