ravindras Posted August 18, 2018 Share Posted August 18, 2018 13 minutes ago, sonykongara said: godavari to krishna 250km vesadu ela edi distance between polavaram to aqueduct on krishna river is 255km. distance between acqueduct and bollapalle reservoir is (317-255) km. canal alignment is different to road alignment. canal distance will be less/more than road distance . Link to comment Share on other sites More sharing options...
ravindras Posted August 18, 2018 Share Posted August 18, 2018 16 minutes ago, RamaSiddhu J said: Actually considering pattiseema completion in record time anything is possible if we have money ysr completed earth work on canal between polavaram and prakasam barrage. otherwise it could take more time. there are no tunnels between polavaram and vijayawada. at best cbn can complete in 10 years if he fulfill following conditions. 1. provide sufficient funding 2. works given to capable contractors like meil/navayuga 3. make sure no legal cases due to land acquisition and r&r Link to comment Share on other sites More sharing options...
Raaz@NBK Posted August 18, 2018 Share Posted August 18, 2018 22 minutes ago, ravindras said: @Raaz@NBK meeku cbn,lokesh meedha vunna confidence cbn,lokesh ke vundademo? manaki tdp, cbn, lokesh meedha entha affection vunnaa reality ni ardham chesukovaali. there will be practical constraints in implementing any project. Nenu matladedhi Only upto bollapalli reservoir not Godavari-penna Link to comment Share on other sites More sharing options...
Raaz@NBK Posted August 18, 2018 Share Posted August 18, 2018 1 hour ago, mahesh1987 said: next 5 years lo harichandrapuram-nakerikallu linking complete chesthe excellent gaa chesinattu bollapalli reservoir ippudu alla avvadu Upto bollapalli reservoir Next tenure lo Pakka avtadhi bro.. Godavari - penna long term process Link to comment Share on other sites More sharing options...
ravindras Posted August 18, 2018 Share Posted August 18, 2018 Just now, Raaz@NBK said: Nenu matladedhi Only upto bollapalli reservoir not Godavari-penna tough part is between godavari and bollapalle as it includes canal,tunnels and aqueduct. easiest part is between bollapalle and somasila (except 1.7 km tunnel) mostly canal. Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 47 minutes ago, ravindras said: tough part is between godavari and bollapalle as it includes canal,tunnels and aqueduct. easiest part is between bollapalle and somasila (except 1.7 km tunnel) mostly canal. vykuntapuram, lift works ki next month ne sankusthapana ave use chesukuntaru NSP canal karempudi daka, inko 2 lift pedithe saripothundi Link to comment Share on other sites More sharing options...
Raaz@NBK Posted August 18, 2018 Share Posted August 18, 2018 13 minutes ago, ravindras said: tough part is between godavari and bollapalle as it includes canal,tunnels and aqueduct. easiest part is between bollapalle and somasila (except 1.7 km tunnel) mostly canal. Link to comment Share on other sites More sharing options...
ravindras Posted August 18, 2018 Share Posted August 18, 2018 10 minutes ago, sonykongara said: lift works ki next month ne sankusthapana ave use chesukuntaru NSP canal karempudi daka, inko 2 lift pedithe saripothundi we need another canal from godavari, polavaram rmc is not enough Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 1 minute ago, ravindras said: we need another canal from godavari, polavaram rmc is not enough adi ok kotha canal tavvutaru, lift vacchedi vykuntapuram back water nundi kadha nenu adi chebutunna Link to comment Share on other sites More sharing options...
ravindras Posted August 18, 2018 Share Posted August 18, 2018 Just now, sonykongara said: adi ok kotha canal tavvutaru, lift vacchedi vykuntapuram back water nundi kadha nenu adi chebutunna i got it now Link to comment Share on other sites More sharing options...
Raaz@NBK Posted August 18, 2018 Share Posted August 18, 2018 11 minutes ago, ravindras said: i got it now Ipudu ardham ayindha bro endhuku avtadhi antunnamo.. Dhini Medha disco kuda jarigindhi @AnnaGaru thread lo Link to comment Share on other sites More sharing options...
ravindras Posted August 18, 2018 Share Posted August 18, 2018 Just now, Raaz@NBK said: Ipudu ardham ayindha bro endhuku avtadhi antunnamo.. Dhini Medha disco kuda jarigindhi AnnaGaru thread lo i got it now. thanks for info Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 9 minutes ago, ravindras said: i got it now polavaram - krishna aqueduct main work bro, bollapalli kondala madya natural reservoir undi antunaru 90 to 100 TMC store cheyyvachhu anta Link to comment Share on other sites More sharing options...
mahesh1987 Posted August 18, 2018 Share Posted August 18, 2018 47 minutes ago, Raaz@NBK said: Upto bollapalli reservoir Next tenure lo Pakka avtadhi bro.. no chance Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 Link to comment Share on other sites More sharing options...
AnnaGaru Posted August 18, 2018 Share Posted August 18, 2018 phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60.... we don't need bollapalli for this......phase-1 will complete in 2019... already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8% extra Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 3 minutes ago, AnnaGaru said: phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60.... we don't need bollapalli for this......phase-1 will complete in 2019... already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8% extra adi ok bro dani meda naku doubt ledu, phase-2 meda ne disco Link to comment Share on other sites More sharing options...
sonykongara Posted August 18, 2018 Author Share Posted August 18, 2018 4 minutes ago, AnnaGaru said: phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60.... we don't need bollapalli for this......phase-1 will complete in 2019... already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8% extra 7 minutes ago, AnnaGaru said: phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60.... we don't need bollapalli for this......phase-1 will complete in 2019... already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8% extra next month sankustapana Link to comment Share on other sites More sharing options...
AnnaGaru Posted August 18, 2018 Share Posted August 18, 2018 11 minutes ago, sonykongara said: adi ok bro dani meda naku doubt ledu, phase-2 meda ne disco not at all worried for phase-2 and no urgency and it can wait(don't get me wrong but phase-1 itself gives 15+ lakhs acres life) Other than MODI any other PM would support phase-2,3 with center help as it solves south 3 states problem...so better to finish phase-1 and show to india now "with gravity do you water to kaveri/penna or not" phase-1 is like lift&use and no storage.....2,3 all gravity(zero life) and center should pitch-in Link to comment Share on other sites More sharing options...
swarnandhra Posted August 18, 2018 Share Posted August 18, 2018 9 minutes ago, AnnaGaru said: phase-1 is pipeline+canal 60 kilometers and it will complete in 2019..that will get minimum 50 tmc and upto 60.... we don't need bollapalli for this......phase-1 will complete in 2019... already land surveyed and identified and tender called.....contracts get 8%(after august) extra so no one showed up...now they call again and they will bid with 8% extra phase 1 lo 50 TMC not possible. that is 7k cusecs for 83 days continuously. Link to comment Share on other sites More sharing options...
AnnaGaru Posted August 18, 2018 Share Posted August 18, 2018 3 minutes ago, swarnandhra said: phase 1 lo 50 TMC not possible. that is 7k cusecs for 83 days continuously. munner+other local flood left to sea is 15-20+ tmc and that is key....when phase-1 complete they run pattiseema non-stop...right now it is stopped 15-20 days in the middle also addtional flow avilable with chintalapudi lift....and right poalvaram discharge to eluru canal is done at upper point and works almost complete... Link to comment Share on other sites More sharing options...
swarnandhra Posted August 18, 2018 Share Posted August 18, 2018 2 minutes ago, AnnaGaru said: munner+other local flood left to sea is 15-20+ tmc and that is key....when phase-1 complete they run pattiseema non-stop...right now it is stopped 15-20 days in the middle also addtional flow avilable with chintalapudi lift....and right poalvaram discharge to eluru canal is done at upper point and works almost complete... even after considering eluru canal diversion+chintalapudi, there is no more than 3-4k available at barrage for this lift. So, 3k for 100 days + extra 4k for 30 days(munneru) is 35 TMC Link to comment Share on other sites More sharing options...
Dravidict Posted August 18, 2018 Share Posted August 18, 2018 2 hours ago, ravindras said: ysr completed earth work on canal between polavaram and prakasam barrage. YSR died in 2009. This is the status of Polavaram till 2014. Link to comment Share on other sites More sharing options...
Hello26 Posted August 18, 2018 Share Posted August 18, 2018 1 hour ago, Dravidict said: YSR died in 2009. This is the status of Polavaram till 2014. We need to include 2 more rows (Approvals and Land Acquisition issues) per each of 3 main works (RMC, LMC and Head Works). The status by the end of YSR rule was zero in those parameters. Link to comment Share on other sites More sharing options...
ravindras Posted August 19, 2018 Share Posted August 19, 2018 6 hours ago, Dravidict said: YSR died in 2009. This is the status of Polavaram till 2014. 5 hours ago, Hello26 said: We need to include 2 more rows (Approvals and Land Acquisition issues) per each of 3 main works (RMC, LMC and Head Works). The status by the end of YSR rule was zero in those parameters. some earthwork is pending due to land acquisition problems. jarigina canal earthwork anthaa ysr time lone. rosaiah,kiran kumar reddy time lo emi work jaragaledu. migilina land acquisition cbn time lo complete ayyindi. earthwork complete ayyindi. is it possible to acquire land and complete entire canal of the length more than 175 km within 1 to 2 years? think practically. ysr time lo headworks jaragaledu. canal earth works jarigaayi Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.