4 hours ago, sskmaestro said:

I am not getting what you are saying. Always a TDPian forever. What I mentioned about is the “pukaru “ Ba Ja Pa ffas will create in six months time 

sorry , i couldn't understood your intention. anyway pk, baffas, jaffas can't create any rumors due to following reasons

1. without completing diaphragm wall ecrf couldn't start

2. without completing jetgrouting lower & upper cofferdam construction will not start.

ecrf dam, lower & upper coffer dam will start in october/november 2018 . even if they create rumors nobody going to believe it

Link to comment
Share on other sites

  • Replies 62
  • Created
  • Last Reply
17 hours ago, sagarkurapati said:

Means wall works ayyipoyaya

Diaphragm wall is the toughest phase of all the works in this project...usual ga river bed lo kontha varaku sand and inkaa down layers lo banka matti or rock vuntai...but polavaram lo 50 to 100 meters daaka sand vundi bhoomi lopala....ante isuka meeda dam kattali....

 

to avoid erosion problems, akkada 300 feet thickness tho, 100 mts depth tho and 1.3 KM’s poduguna concrete wall kattali bhoomi lopala....daani paina dam kadataaru....this is like 10 prakasam barriages full of concrete beneath the soil....and you have to do this in a river like godavari which is highly flood prone every year and with water round the year....

 

Mana govt ani kaadu gaani...evaru chesina goppa ga chesinatte intha work....

 

inka migilindi antha above the soil works....

 

absolute kudos to the engineering team and govt.

Link to comment
Share on other sites

5 hours ago, Bezawada_Lion said:

Diaphragm wall is the toughest phase of all the works in this project...usual ga river bed lo kontha varaku sand and inkaa down layers lo banka matti or rock vuntai...but polavaram lo 50 to 100 meters daaka sand vundi bhoomi lopala....ante isuka meeda dam kattali....

 

to avoid erosion problems, akkada 300 feet thickness tho, 100 mts depth tho and 1.3 KM’s poduguna concrete wall kattali bhoomi lopala....daani paina dam kadataaru....this is like 10 prakasam barriages full of concrete beneath the soil....and you have to do this in a river like godavari which is highly flood prone every year and with water round the year....

 

Mana govt ani kaadu gaani...evaru chesina goppa ga chesinatte intha work....

 

inka migilindi antha above the soil works....

 

absolute kudos to the engineering team and govt.

It is 1.5 meters thick right ? Not 300 ft

Link to comment
Share on other sites

  • More

    If records are to be broken to complete Polavaram on time, AP will do it. History was created yesterday when 11,153 cubic mts of concrete was laid in a record 24 hrs time creating a national record. Kudos to @ncbn and irrigation officials for pulling off this rare feat.

    22 replies117 retweets339 likes
    Reply
     22
     
    Retweet
     117
     
     
    Like
     339
     
    Direct message
-pkBYCjb_bigger.jpgLokesh NaraVerified account @naralokesh
FollowFollow @naralokesh
More

Compared the progress of 16 natl projects. Shocked to see only 5 have been grounded & Polavaram's the only project on track, thanks to @ncbn. 11 are still under feasibility, appraisal stages. Can't understand why opp parties spread lies to discredit the great work done by @ncbn.

Dfa3c5FU8AAK5mi.jpg
 
Dfa3c5IVQAAcN36.jpg
Dfa3c5IU8AEG6u5.jpg
Dfa3c5KVQAA1ItG.jpg
Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...