Jalayagnam - non-canal works cruel practicals in reality


AnnaGaru

Recommended Posts

-Pulichintala ni chache daka HOLD lo pettadu malli edu polaatam kadatadu design study kuda lekunda ....adi first foundation&with 100% all permissions unnai kani 5 years in HOLD with contractor after taking mobilization advance...started works after Rosaiah came to power settling the issue...

- kattina Janajavati opening chesina days ki egiripoyindi

2008 lo e  changed design project ni nettina etti poyadu DECOIT gadu....Experts warned and TDP those days fought on the design compromise of this with matti katta...

MATTI  tavvakam expert dani matti katta ga marchi nakinchadu....

http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/Gorakallu-reservoir/article15325381.ece

There is not even single project that stores just few TMC completed by DECOIT without major issues

గోరకల్లు అనేది ఇరిగేషన్ లో ఒక శాపం ల తయారు అయ్యింది ....ఏమి చెయ్యాలో అర్ధం కాకా బొప్పి కడుతుంది.....

da201773-4cc8-47b1-a1d4-58caf7916b21

 

 

 

Link to comment
Share on other sites

TDP showed below expert study when DECOIT compromised on this but emi chestam dabbulu kosam JET SPEED lo deni meda vellipoyadu.....

DECOIT gadu a project ayete PROBLEM undo dani meda mari fast ga mobilization advances/money release ichadu....Telangana lo DEVADULA LIFT projects meda 5000 crores pettadu dani scrap chesaru design change to taruvata.....

 

100% perfect project PULICHINTALA till he died was on HOLD after contractor left project in 2005 after taking mobilization advance ....

/*****************TDP&CBN govt done studies before 2004 and clearly pointed out not to compromise design of this this wihout studies ....CBN time they done study and gave perfect report on this reservoir challenges ...But DECOIT released 100% budget for this......

:clickhere:

the Gorakullu Reservoir site was located over karstic limestone outcrops and that its viability could not be ascertained without extensive and time-consuming investigations

The outcome of these studies--described herein--resulted in a reformulation of the SRBC project design, namely, that the Gorakullu Reservoir would not be necessary for irrigation of 65,000 ha and that a reduced capacity Owk Reservoir would be included in the project

/*****************************

 

Vaddu anna kattaru danni ...ippudu international experts cheppina suggestions kooda fail avutunnai...better scrap it anipistundi.....

 

Nuvvu levantaru entra ekkada daridram unna nuvvu untavu....

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...