పట్టిసీమ ప్రాజెక్ట్ పూర్తి చేసి ప్రజలకు దేవుడైన చంద్రబాబు..!


Saichandra

Recommended Posts

22 minutes ago, niceguy said:

I think this project was done with less than 2000 cr Budget.

Why don’t we try for similar projects serves at least 2 districts? 

Ee pushpams meeda depend avvakunda every year 2K budget allocate chesi ilanti projects chesthe better.

NSP right canal at guttikonda/Nakerekallu daggara Krishna-Godavari water source(amaravati near by) distance <35KM.....CBN Vykuntapuram barrage proposal anduke...

Vykuntapuram barrage=>via 75-talluru-sattenapalli to NSP right canal ani study chesindi state

 

Kanni center Krishna-Godavari plans are confusing our state leads now...AP wants to use Polavaram canal full capacity the day KCR rejected dummagudem....Now suddenly PUSHPAMS talk show a (dummagudem plans back again)NEW canal&LIFT against gravity to Sagar tailpond area.......center NEW CANAL plans take another 5-10+ years as it requires multiple lifts in T with lif tof 100M meters to tailpond alone...

T batch rejected dummagudem so CBN came up with new RESERVOIR at remidicharla.....

Now the batch that once opposed pulichintala in the new role "as center irrigation advisers" is directing center with Dummagudem kind of plan again......To be frank we don't need that with what CBN 50KM lift from vykuntapura,..

just with 4-5K crores another 100 TMC can be shifted from polavaram canal at full capacity to Vykuntapurambarrage..... if center gives clearences instead of getting mislead NSP right canal 10 lakh acre problem will be solved.........

Vykuntapura-NSP right canal is Basin change ani addam padutunnaru center vallu anduke CBN koncham slow ayyadu to see what center plans are

Link to comment
Share on other sites

31 minutes ago, AnnaGaru said:

NSP right canal at guttikonda/Nakerekallu daggara Krishna-Godavari water source(amaravati near by) distance <35KM.....CBN Vykuntapuram barrage proposal anduke...

Vykuntapuram barrage=>via 75-talluru-sattenapalli to NSP right canal ani study chesindi state

 

Kanni center Krishna-Godavari plans are confusing our state leads now...AP wants to use Polavaram canal full capacity the day KCR rejected dummagudem....Gadkari plans show a (dummagudem plans back again)NEW canal&LIFT against gravity to Sagar tailpond area.......center NEW CANAL plans take another 5-10+ years as it requires multiple lifts in T with lif tof 100M meters to tailpond alone...

T batch rejected dummagudem so CBN came up with new RESERVOIR at remidicharla.....

Now the batch that once opposed pulichintala in the new role "as center irrigation advisers" is directing center with Dummagudem kind of plan again......To be frank we don't need that with what CBN 50KM lift from vykuntapura,..

just with 4K crores another 100 TMC can be shifted from polavaram canal at full capacity using Vykuntapuram if center gives clearences.........NSP right canal is Basin change ani addam padutunnaru center vallu anduke CBN koncham slow ayyadu...

Anna garu 100 tmc realistic? right canal full capacity 17.5K cusecs kada. for delta usage 1tmc per day kada. any chances of increasing the right canal capacity?

Link to comment
Share on other sites

15 minutes ago, Jeevgorantla said:

Anna garu 100 tmc realistic? right canal full capacity 17.5K cusecs kada. for delta usage 1tmc per day kada. any chances of increasing the right canal capacity?

Yes, 17.5K capacity...Right now close to 1 TMC per day with 8800K cusecs ....also lining work completed this year to support 17.5K and we tested with 8K for 3 years so good to go...

CBN coffer dam finish ayina NSP RIght<====Vykuntapuram with in 1 year finish chestadu....without Vykuntapuram barrage also initially they can do with multi-stage lifts of 40KM...

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...