Jump to content

Nagarjuna Sagar


Recommended Posts

On 11/28/2017 at 11:23 PM, KvrReddy said:

DB lo anni cheppe pedhollu okkasari Prakasam ki velli chudandi ela undo.. Edina chepthe Jagan pans anadam.. last 3 years not even single project started in Prakasam.. IIIT annaru adi ekkadiki poyindoo teliyadhu.. Adedo zone annadu adi etupoyindoo teliyadhu...Huge Govt lands unnayi.. National highway connectivity undi..Ports unnayi dagario.. Okka project undadhu water raavu

  

Correct ga chepav bhayya ikakda unna valaki ardam kadhu a badha ento meru anukune so called OC valu beldari panulaki velthunaru adi ma jila parisithidi asalu pattiseema water ekkada daka vasthado telsa ikkada nunna valaki

velaki backward ante kevalam Rayalseema and North andhra matrame kanispisthadi prakasam and north nellore matramkanipinchav endhuku ante akkada unna valu gorrelu kada kadupu nindina nindaka poyina govt ni bedirinchaleru kada

Link to comment
Share on other sites

1 hour ago, bnalluri said:

Correct ga chepav bhayya ikakda unna valaki ardam kadhu a badha ento meru anukune so called OC valu beldari panulaki velthunaru adi ma jila parisithidi asalu pattiseema water ekkada daka vasthado telsa ikkada nunna valaki

velaki backward ante kevalam Rayalseema and North andhra matrame kanispisthadi prakasam and north nellore matramkanipinchav endhuku ante akkada unna valu gorrelu kada kadupu nindina nindaka poyina govt ni bedirinchaleru kada

Dont bother uncle db lo 70% keyboard batch eee...  Ground realty telisi edisi savad :D

Link to comment
Share on other sites

On 11/29/2017 at 9:44 AM, KvrReddy said:

Pattiseema kattina taruvatha matram Sagar right canal kinda mamulu bokka kaadu.. Srisailam ki vachna water Rayalaseema ki istunnaru .. Krishna delta ki Pattiseema dwara istunnaru.. Madhya lo maa prakasam vallani matram :buttkick::buttkick:

bro.. for ur info.. Sagar right canal ki water iche way process/construction lo vundhi as per latest document..

Link to comment
Share on other sites

Just now, Raaz@NBK said:

No automatic alt text available.

chintalapudi ethipothala padhakam is under construction.. idhi kanaka ayipothe.. NS right canal ki water release ayye chance vundhi..

 

NS left ki canal neeti vata chintalapudi lift irrigation dwara ichi.. NS right canal ki water vodhulutaru emo.. as per above picture.

inka clarity ravalsi vundhi..  NS left canal TS lo vundhi anukuntuna..  andhuke koncham confusion lo vundhi..

 

konni complications vunattu vunnai..

 

CBN never had intention to neglet Prakasam dist. why he will neglet ????

industries ravali ante mundhu water vundali.. 

once water vasthe development works start avutaayi..

last time chepindhi emitante Japan companies will invest in prakasam ani

Link to comment
Share on other sites

Veligonda Project is an under construction irrigation project located in Prakasam district in Andhra Pradesh, India.[1] When completed, the project will provide irrigational facilities to 459,000 Acres and drinking water to 1.5 million people in 29 Mandals of fluorine and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater of Krishna Riverfrom foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir. The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to Poola Subbaiah irrigation project.[2][3]

The construction includes two parallel tunnels of 18.8 km with 9.2 m and 7 m internal diameter and 21.6 km Flood flow canal for the water transmission system linking with Srisailam Reservoir up to Guntur-Kurnool road. The project is being implemented by double shielded tunnel boring machine to make the tunnel without disturbing wildlife in the Nagarjunsagar-Srisailam Tiger Reserve.[4]

Link to comment
Share on other sites

Status of progress of the project[edit]

  • As of May 2015, 12.6 km of tunnel digging had been completed for the first tunnel, and 8.1 km had been completed for the second tunnel.
  • As of June 2016, 13.1 km of tunnel digging had been completed for the first tunnel, and 10 km had been completed for the second tunnel.
  • As of March 2017, 14 km of tunnel digging had been completed for the first tunnel, and 10.8 km had been completed for the second tunnel.
  • Only a little progress has been made in the past few years by contractors citing the equipment problems and payment issues with government.
  • First phase of the project to be completed by March 2018.[5]
Link to comment
Share on other sites

Right now there is water availability at NS. 

Ns right canal kinda mainly, macharla, vinukonda , narasarao peta, addanki const. full ga depend Ayyi vunnayi. Inkonni vunnayi partial ga. Total around 10 + lakhs. 

Total 130 tmc kavali, ippudu Rabi lo paddy ki water start chesthe - total 90 days ivvali in phases. For the current Rabi around 55 to 60 needed. And Mar to July , drinking water ki kavali. Due to climate conditions evoparatiin loss is more in this area. And more over over stealing too in upper areas  

Sagar right canal gates mana chethiloki vatchevaraku  - need to depend on KRMB and TG 

AP 10 request chesthe TG 15 chesthundi every time. KRMB middle ga tala oka 8 isthundhi. 

Link to comment
Share on other sites

1 minute ago, rk09 said:

Right now there is water availability at NS. 

Ns right canal kinda mainly, macharla, vinukonda , narasarao peta, addanki const. full ga depend Ayyi vunnayi. Inkonni vunnayi partial ga. Total around 10 + lakhs. 

Total 130 tmc kavali, ippudu Rabi lo paddy ki water start chesthe - total 90 days ivvali in phases. For the current Rabi around 55 to 60 needed. And Mar to July , drinking water ki kavali. Due to climate conditions evoparatiin loss is more in this area. And more over over stealing too in upper areas  

Sagar right canal gates mana chethiloki vatchevaraku  - need to depend on KRMB and TG 

AP 10 request chesthe TG 15 chesthundi every time. KRMB middle ga tala oka 8 isthundhi. 

so Nagarjunasagar tho pani lekunda Prakasam dist ki Srisailam dam nunchi connectivity isthunnaru..

Link to comment
Share on other sites

3 minutes ago, Raaz@NBK said:

so Nagarjunasagar tho pani lekunda Prakasam dist ki Srisailam dam nunchi connectivity isthunnaru..

Only for west prakasam thru veligonda project. Like kumbum, donakobda and May reaches up to singarayakonda

Link to comment
Share on other sites

3 minutes ago, rk09 said:

Raaz bro.. mee pooling area ki water source yenti. Is it from NS right canal or any lifts from krishna itself. 

 

I mean before pooling time - agriculture ki water source. 

river ki 3 kMs varaku bore pumps bro..

metta polala side ayithe Kondaveeti vaagu nunchi water vachevi.. 

krishna river ki kondaveeti vaagu madhyalo oka chinna vaagu vundhi.. ayithe vachina flood water Krishna river loki vadhilevallu..

Thulluru ki ayithe Krishna river nunchi pipes vesaru (scheem name gurthu ledhu) bro,, andharu aa scheem dwara vachina water ni rotation padhatilo lands taduputaru :shakehands:

Link to comment
Share on other sites

Deniki adiganu ante monna TG krishna delta ki antha allocation yenduku ante - ippudu capital kaduthunnaru and more over bhoomi sagu lo ledu ga ani ante. 

Asalu oka 30 K acres ki Ila antunte- emi irrigation experts babu anukonna. 

So meeru cheppe Dani batti - Oka 50 percent no dependency on krishna delta allocations. 

Link to comment
Share on other sites

7 hours ago, Raaz@NBK said:

At Present NS right canal ki ippudu water vadhilithe next year drinking water ki kuda kastham avtundhi ani chepparu.. 

 

may be in NS reserviour ki water ravali emoo

ippati varaku 25TMC icharu pongal varaku istharanta ratuvatha oka 15/20 days gap ichi march ending varaku istharanta

oka planning ledu bokka ledu drinking water adi idi ani bokkalo kaburlu cheptharu malle

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...