Don't worry about existing tracks and trains wait for few years you will enjoy the fruits once industry expertise in tracks making ready ayite...temporary relief will not fetch you anything

Expertise on what ? Broad gauge tracks ki bullet train experience ki sambandam enti ?

 

We have the longest and best railway network...Only problem is with the technology..It is old and needs lot of upgrades to signaling and interlocking systems...Decades old technology tho ennallu nadipistaru...

 

Ippudu initiative teskunte it will take 5 to 10 years to gradually upgrade the entire system...Body batch is responsible for every death

Link to comment
Share on other sites

Expertise on what ? Broad gauge tracks ki bullet train experience ki sambandam enti ?

 

We have the longest and best railway network...Only problem is with the technology..It is old and needs lot of upgrades to signaling and interlocking systems...Decades old technology tho ennallu nadipistaru...

 

Ippudu initiative teskunte it will take 5 to 10 years to gradually upgrade the entire system...Body batch is responsible for every death

Tracks okate kaadu train designing signalling annitlo new technology untundi 400 members tho oka University model design chestunaru...

Link to comment
Share on other sites

Adi present govt one rupee teyatledu nearly 88 percent loan for 50 years moreover made in India ki pedda boost every part will be made in India,expertise avutaru labour's nearly 20000 people ki employment tracks repair ki evaru enta help cheyaru....

 

why would japan will give loan if every part is made in india ?? 

Link to comment
Share on other sites

money manam invest cheyyatamu ledhu antunnaru kadha... so how is it relevant to upgradation of other routes

every PPP project is projected that way. there usually are viability gap funding type clauses. remember L&T metro  was given land to do real estate buisiness to recoupe some losses. This project is going to be a big white elephant eating major share of railway budget for decades.

Link to comment
Share on other sites

every PPP project is projected that way. there usually are viability gap funding type clauses. remember L&T metro was given land to do real estate buisiness to recoupe some losses. This project is going to be a big white elephant eating major share of railway budget for decades.

Current budget 1.08 lakh plus intrest it may reach to 1.20 intrest rate 0.1 so for 50 years it would be around 2500 crores apart from providing technical guidlance Japan sonthaga construct cheyatledu...okavela budget increase ayina ledu some Japan companies benefit pondina courts are there

Link to comment
Share on other sites

Any reason why they choose Mumbai-ahmedabad?

Vallaki two state govts bjp ruling unavi kavali Deniki two reasons mottam 12 stations nunchi potundi land issue kakudadu and state govt full support undali and of course political party ki political mileage kuda important so they choose mh and gujarat

Link to comment
Share on other sites

Current budget 1.08 lakh plus intrest it may reach to 1.20 intrest rate 0.1 so for 50 years it would be around 2500 crores apart from providing technical guidlance Japan sonthaga construct cheyatledu...okavela budget increase ayina ledu some Japan companies benefit pondina courts are there

 

it is not that simple. they provide 0.1% interest on 80% only. remaining 20% is at 8% interest. check this article...

 

http://indianexpress.com/article/india/india-news-india/mumbai-ahmedabad-bullet-train-will-need-to-make-100-trips-a-day-to-be-viable-iim-study/

"

Mumbai-Ahmedabad bullet train will need to make 100 trips a day to be viable: IIM study The train will have to ferry between 88,000 and 110,000 passengers every day to ensure that it repays the loans with interest on time"

Link to comment
Share on other sites

it is not that simple. they provide 0.1% interest on 80% only. remaining 20% is at 8% interest. check this article...

 

http://indianexpress.com/article/india/india-news-india/mumbai-ahmedabad-bullet-train-will-need-to-make-100-trips-a-day-to-be-viable-iim-study/

"

Mumbai-Ahmedabad bullet train will need to make 100 trips a day to be viable: IIM study The train will have to ferry between 88,000 and 110,000 passengers every day to ensure that it repays the loans with interest on time"

I will not feel sad if it incur minor losses we should also take overall environment it creates after this huge investment...

Link to comment
Share on other sites

it is not that simple. they provide 0.1% interest on 80% only. remaining 20% is at 8% interest. check this article...

 

http://indianexpress.com/article/india/india-news-india/mumbai-ahmedabad-bullet-train-will-need-to-make-100-trips-a-day-to-be-viable-iim-study/

"

Mumbai-Ahmedabad bullet train will need to make 100 trips a day to be viable: IIM study The train will have to ferry between 88,000 and 110,000 passengers every day to ensure that it repays the loans with interest on time"

And moreover 20 percent ki center funded so they are expecting 8 percent intrest and payment starts after 16 year by that time calculating the population and movement of people it is feasible

Link to comment
Share on other sites

What is the additional benefit BJP will get by choosing Ahmedabad-Mumbai route for Bullet train?

 

Already ee 2 states lo 95% MPs (GUJ-100%, MH-90%) are with NDA (BJP+SS). BJP & SS will surely loose few seats in these states whatever they do.

 

Agreed it is busiest route, grow ayye chance vunna chota kooda take up chesthe baagundedi.

 

Same thing they are doing with River linking project. North side first take up chesthunnaru putting South & Orissa aside.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...