Jump to content

Vijayawada- Amaravati seed capital access way


Recommended Posts

Waste of time and money.. Ee bridge valla Use ledhu Capital ki kaani Vijayawada ki kani..

 

Already Vij ORR dhi (NH5 bypass) sanction ayindhi.. Money allot ayyayi. Kani panule modhalu petaledhu..

 

Ee Bypass valla Kolkata,Chennai and Hyd nunchi Heavy vehicles vasthai for construction purpose.

 

And Vijayawada ki inside nundi pass ayye traffic(outer vehicles) 100% tagudhii Hyd-kolkata, Hyd- Chennai, kolkata-chennai nunchi Heavy vehicles city loki enter avvavu..

 

Guntur,Ongole nunchi Airport ki velle valaki easy avtadhi.

 

Seed capital to Airport ki kuda easy access vuntadhi

 

Ee Bypass panulu modhalu pettakunda kothaga ee Bridge lu endhuku ?? :sleep:

 

Eppudu survey cheyyali, eppudu tenders pilavali eppudu work complete avvali :sleep:

20160615a_005135012.jpgmiru cheppedi dini gurinchena brother,bot model anedi problem akkada.

Link to comment
Share on other sites

why no one is questioning about Toll plaza between Guntur & Vijayawada near Nagarjuna university.. this is the main road that connects Guntur & Vijayawada and the toll fee hefty (one way 85+ rupees).. this is going to be a big hurdle for the capital, Gnt & VJA connectivity kada

Link to comment
Share on other sites

why no one is questioning about Toll plaza between Guntur & Vijayawada near Nagarjuna university.. this is the main road that connects Guntur & Vijayawada and the toll fee hefty (one way 85+ rupees).. this is going to be a big hurdle for the capital, Gnt & VJA connectivity kada

 

Khaja toll gate.. center paridi lo undi anukuntaa.. NH9 kada aa road??

Link to comment
Share on other sites

విజయవాడ: ఈనెల 25న రైతులకు ముఖ్యమంత్రి చంద్రబాబు ప్లాట్ల పంపిణీ చేస్తారని మంత్రి నారాయణ స్పష్టం చేశారు. అనంతరం సీఎం  పలు అభివృద్ధి పనులకు శంకుస్థాపన చేస్తారని తెలిపారు. అందులో భాగంగా ఉండవల్లి నుంచి ప్రారంభమ్యే స్పీడ్ యాక్సిస్ ఆరులైన్ల రహదారికి శంకుస్థాపన చేస్తారన్నారని, వెలగపూడిలో ఎన్టీఆర్ క్యాంటిన్‌ను ప్రారంభిస్తారని వెల్లడించారు

Link to comment
Share on other sites

brother #43 lo ala addadiddam ga nallaga vunna lines enti? intaku mundu maseter plan lo straight roads vundevi, ee black color lo kothaga eventi?

Madhyalo add chesaru. First icchina road grid super. Ippudu ila addadhiddamga roads vesthe dharidhram ga vuntundhi. Endhuku marcharo mari
Link to comment
Share on other sites

రాజధానిలో రహదారుల నిర్మాణం
 
గుంటూరు: వెలగపూడిలో అమరావతి సీడ్‌ క్యాపిటల్ రహదారుల నిర్మాణానికి శంకుస్థాపన సీఎం చంద్రబాబు చేతులమీదుగా జరిగింది. ఈ కార్యక్రమానికి మంత్రులు నారాయణ, పుల్లారావు, ఎంపీ గల్లా హాజరయ్యారు. తొలిదశలో దొండపాడు నుంచి కొండవీటివాగు సూయిజ్‌ వరకు రూ.242.3కోట్లతో 18.3కి.మీ. మేర నాలుగు లైన్ల రహదారి నిర్మాణం అమరావతిలో నిర్మించతలపెట్టారు. అమరావతిలో 8 ప్రధాన రహదారులు నిర్మిస్తుండగా ఇది అతిపెద్దది.
Link to comment
Share on other sites

first dani lone vampu unnayi brother, ede bagundi.

Chinna chinna vampulu akkadakkada vunna kani neat ga uniform ga vundhi. Ippudu map meedha chupisthunna roads crisscross ga uniformity maintain cheyyatledhu. Previous road grid

 

25arbx3.jpg

Link to comment
Share on other sites

Another line nekkallu-krishnaya palem bisecting the park. So, does this mean old master plan thrown away?

first dani lo  village bayata nundi road plan chesaru, houses nastapokunda roads ni  baga vampulu tipparu, taruvtha  cbn vampulu lekunda, line laga undali ani cbn cheppadu

Link to comment
Share on other sites

Chinna chinna vampulu akkadakkada vunna kani neat ga uniform ga vundhi. Ippudu map meedha chupisthunna roads crisscross ga uniformity maintain cheyyatledhu. Previous road grid

 

25arbx3.jpg

expressway 64 km ani undiga bro, ippudu vesedi  express way kadha? only seed capital access way na?

Link to comment
Share on other sites

seed capital access way is total ~21.5 km (18.3+3.08). 3 km stretch lo flyover undi (near vundavalli). 

cost estimation was 230+339 (second stretch is costly because of flyover)

Article in #43 mentioning a road some thing like 18.3 km long. This is matching with first leg of seed capital access way. (slightly higher cost though 242 cr)

Link to comment
Share on other sites

seed capital access way is total ~21.5 km (18.3+3.08). 3 km stretch lo flyover undi (near vundavalli). 

cost estimation was 230+339 (second stretch is costly because of flyover)

Article in #43 mentioning a road some thing like 18.3 km long. This is matching with first leg of seed capital access way. (slightly higher cost though 242 cr)

a news nene ga post chesanu adi telusu brother,express way gurinchi adiga.

Link to comment
Share on other sites

a news nene ga post chesanu adi telusu brother,express way gurinchi adiga.

sorry, did not realize you posted that. Express way would be built by master developer kada. oka doubt, adi kuda government kadithe inka vadu emi chestadu?

Seed access road is in purple color in the picture. Starting point is Borupalem. but #43 article lo dondapadu antunnadu. anta confusion. 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...