Dravidict Posted August 7, 2016 Share Posted August 7, 2016 oka BT layer complete chestaremo next 4 days lo Link to comment Share on other sites More sharing options...
Guest Urban Legend Posted August 7, 2016 Share Posted August 7, 2016 oka BT layer complete chestaremo next 4 days lo ha vestunnatu vunnaru Link to comment Share on other sites More sharing options...
Guest Urban Legend Posted August 7, 2016 Share Posted August 7, 2016 Road level bridge at durga temple idhi complete aithey bagundedhi Durga Flyover-Pre-Fabricated Slab Beams work-Latest Position as on 07.08.2016-Vijayawada Link to comment Share on other sites More sharing options...
PP SIMHA Posted August 7, 2016 Share Posted August 7, 2016 Road level bridge at durga temple idhi complete aithey bagundedhi Durga Flyover-Pre-Fabricated Slab Beams work-Latest Position as on 07.08.2016-Vijayawada https://www.youtube.com/watch?v=Jyyf3v36GN0 Looks like it will take another two years to complete the flyover and to become operational Link to comment Share on other sites More sharing options...
seenu454 Posted August 7, 2016 Share Posted August 7, 2016 Looks like it will take another two years to complete the flyover and to become operational ok PP Link to comment Share on other sites More sharing options...
Guest Urban Legend Posted August 7, 2016 Share Posted August 7, 2016 Looks like it will take another two years to complete the flyover and to become operational inko 8 months anukuntunna bro delay ki reason The works moved at a fast pace till March-end. But the bridge collapse incident in Kolkata prompted the authorities to opt for a fresh scrutiny of the project design involving several consulting companies to study the various safety aspects before finalising it. “After Kolkata fiasco, the project design went for a detailed scrutiny. It was a long-drawn process involving five different agencies who vetted the plan before its finalisation. Now, the designs are frozen and we’ll go ahead with the works,” Collector Babu A. told The Hindu on Sunday. The flyover, initially designed by AECOM, an American design consultant, was sent to a proof-reading consultant, which, in turn, sent it to a safety consultant, who studied key aspects like vehicular and structural safety besides making sure that it can resist natural calamities like earthquakes. The plan was then assessed by engineers of Soma Enterprise Ltd, a company which develops core infrastructure projects, who submitted it to a technical authority consultant working under National Highways. Finally, it was analysed by Aarvee Associates, a multi-disciplinary engineering consulting company with a pan-India presence before finalising it. “As part of modifications, we had to change a piling concept. The flyover is a complicated ‘S’-shaped structure. Nine of its pillars fall in Krishna River while another three fall in a canal and one of them is a 19-metre-high pillar,” explains Mr. Babu. He said by Pushkarams around 10 of the 54 segments in the project will be completed. “All the pillars will be in place by then and below the structure will be a four-lane road which will later be made six-lane,” said Mr. Babu. The project design includes two vehicular underpasses and a pedestrian underpass, besides a subway in front of the Durga Ghat. “The delay is actually for the good as the project has passed all tests before it is put to use,” said Mr. Babu. Link to comment Share on other sites More sharing options...
PP SIMHA Posted August 7, 2016 Share Posted August 7, 2016 inko 8 months anukuntunna bro delay ki reason The works moved at a fast pace till March-end. But the bridge collapse incident in Kolkata prompted the authorities to opt for a fresh scrutiny of the project design involving several consulting companies to study the various safety aspects before finalising it. “After Kolkata fiasco, the project design went for a detailed scrutiny. It was a long-drawn process involving five different agencies who vetted the plan before its finalisation. Now, the designs are frozen and we’ll go ahead with the works,” Collector Babu A. told The Hindu on Sunday. The flyover, initially designed by AECOM, an American design consultant, was sent to a proof-reading consultant, which, in turn, sent it to a safety consultant, who studied key aspects like vehicular and structural safety besides making sure that it can resist natural calamities like earthquakes. The plan was then assessed by engineers of Soma Enterprise Ltd, a company which develops core infrastructure projects, who submitted it to a technical authority consultant working under National Highways. Finally, it was analysed by Aarvee Associates, a multi-disciplinary engineering consulting company with a pan-India presence before finalising it. “As part of modifications, we had to change a piling concept. The flyover is a complicated ‘S’-shaped structure. Nine of its pillars fall in Krishna River while another three fall in a canal and one of them is a 19-metre-high pillar,” explains Mr. Babu. He said by Pushkarams around 10 of the 54 segments in the project will be completed. “All the pillars will be in place by then and below the structure will be a four-lane road which will later be made six-lane,” said Mr. Babu. The project design includes two vehicular underpasses and a pedestrian underpass, besides a subway in front of the Durga Ghat. “The delay is actually for the good as the project has passed all tests before it is put to use,” said Mr. Babu. 8 months lo avadhu .. pilars inka 35-40 veyyali and gudders nilapaali , road veyali , markings eyali, electrification jaragali, beautification undi , ippudu teesina silt motham vere chotaki transfer cheyyali .. i beleieve oka shape ravadaniki one year pattina , testing complete ayi full length lo operational ki ravadaniki akkada nundi 6-7 months paduthundi .. over all ga madyaloo emana floods or cyclones lantvi vasthe mala delay avudii .. traffic dsarunam ga tayaru ayindi ... benz circle fly over start ayinapudu untundi asalaaa rachaa.. adi mamauluga undadu .. idi kaka gamon india vadi ORR lo approved rendu varadhi unnayi..okati pulapaka - chiravuru .. inkoti suraya palem , vijayawda to machilipatnam 4 lane .. chala pending prjects unnayi .. central govt epudu isthado mari .. ivvani Link to comment Share on other sites More sharing options...
Guest Urban Legend Posted August 7, 2016 Share Posted August 7, 2016 Kanaka Durgamma Flyover Report http://core.ap.gov.in/CMDashBoard/UserInterface/RoadsAndBuildings/DurgammaReport.aspx#tab1primary Link to comment Share on other sites More sharing options...
PP SIMHA Posted August 7, 2016 Share Posted August 7, 2016 Kanaka Durgamma Flyover Report http://core.ap.gov.in/CMDashBoard/UserInterface/RoadsAndBuildings/DurgammaReport.aspx#tab1primary Link to comment Share on other sites More sharing options...
swarnandhra Posted August 7, 2016 Share Posted August 7, 2016 2 years lo complete ayina great achievement e. pattiseema laga life and death situation emi leduga deenilo. hurry chesi edaina theda vaste prana nashtam jarugutundi. slow ayina parledu quality important. Link to comment Share on other sites More sharing options...
LuvNTR Posted August 8, 2016 Share Posted August 8, 2016 2 years lo complete ayina great achievement e. pattiseema laga life and death situation emi leduga deenilo. hurry chesi edaina theda vaste prana nashtam jarugutundi. slow ayina parledu quality important. Eggzactly. By 2018, KD Flyover complete ayyi, Seed Access Road oka shape ki vochi, Core Capital Structures oka shape loki vosthe chaalu. Link to comment Share on other sites More sharing options...
srinivasulu pokuri Posted August 8, 2016 Share Posted August 8, 2016 Kanaka Durgamma Flyover Report http://core.ap.gov.in/CMDashBoard/UserInterface/RoadsAndBuildings/DurgammaReport.aspx#tab1primary Link to comment Share on other sites More sharing options...
srinivasulu pokuri Posted August 8, 2016 Share Posted August 8, 2016 2 years lo complete ayina great achievement e. pattiseema laga life and death situation emi leduga deenilo. hurry chesi edaina theda vaste prana nashtam jarugutundi. slow ayina parledu quality important.Next UGADHI ki opening anukuntunnanu ee flyover... Link to comment Share on other sites More sharing options...
PP SIMHA Posted August 8, 2016 Share Posted August 8, 2016 2 years lo complete ayina great achievement e. pattiseema laga life and death situation emi leduga deenilo. hurry chesi edaina theda vaste prana nashtam jarugutundi. slow ayina parledu quality important. Enti hurry lenedii... Traffic samsayaa mamulgaa ledhu city lo... Next year kala avakapothe janam tidatharu Link to comment Share on other sites More sharing options...
swarnandhra Posted August 8, 2016 Share Posted August 8, 2016 Yes, it is painful currently, but finishing with good quality however slow it might be saves lot of future pain. It is called very aggressive if somebody sets 2 year deadline for a project that usually takes 5 years. 6 month deadline is just crazy even when that is the only project active. We have 4 projects going on that need to be finished in 3-6 months. With this kind of deadlines, either it will be a compromise on quality or taking risky short cuts. Those short cuts caused leak of water in pattiseema. If the short cuts were taken here lives will be leaked. Link to comment Share on other sites More sharing options...
Raaz@NBK Posted August 8, 2016 Share Posted August 8, 2016 ee pillers medha 6 lane vesthara Link to comment Share on other sites More sharing options...
Nfan from 1982 Posted August 8, 2016 Share Posted August 8, 2016 ee pillers medha 6 lane vesthara Link to comment Share on other sites More sharing options...
sonykongara Posted August 15, 2016 Author Share Posted August 15, 2016 Link to comment Share on other sites More sharing options...
Dravidict Posted August 15, 2016 Share Posted August 15, 2016 Ninna vellanu. Flyover kinda road temporary ga use cheyyavacchu. BT layer vesaru. Stopped all the works for Pushkarams. Link to comment Share on other sites More sharing options...
Guest Urban Legend Posted August 26, 2016 Share Posted August 26, 2016 pushkaralu aipoyina work start cheyyatam ledhu Link to comment Share on other sites More sharing options...
sonykongara Posted August 26, 2016 Author Share Posted August 26, 2016 pushkaralu aipoyina work start cheyyatam ledhu emi bro. Link to comment Share on other sites More sharing options...
Dravidict Posted August 26, 2016 Share Posted August 26, 2016 NHAI vallu asalu final designs fix chesara? Link to comment Share on other sites More sharing options...
Nfan from 1982 Posted August 26, 2016 Share Posted August 26, 2016 Hmmm Link to comment Share on other sites More sharing options...
sonykongara Posted August 30, 2016 Author Share Posted August 30, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 2, 2016 Author Share Posted September 2, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 5, 2016 Author Share Posted September 5, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 7, 2016 Author Share Posted September 7, 2016 Link to comment Share on other sites More sharing options...
Nfan from 1982 Posted September 9, 2016 Share Posted September 9, 2016 Ok Link to comment Share on other sites More sharing options...
sonykongara Posted September 9, 2016 Author Share Posted September 9, 2016 Link to comment Share on other sites More sharing options...
sonykongara Posted September 11, 2016 Author Share Posted September 11, 2016 Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.